Grants and Contracts per year
- 100 - 150 out of 539 results
Search results
-
Finished
Bench Scale Testing of a High Efficiency, Ultra-Compact Process for Pre-Combustion Co2 Capture
Liu, K., Koumoulis, D. & Caudill, L.
University of Southern California
12/1/20 → 12/31/22
Project: Research project
-
Construction Plant Fund Scope: High Performance Cementitious Materials to Advance Expedient Repairs and Structural Hardening Priorities
10/28/20 → 10/27/23
Project: Research project
-
Equipment Plant Fund Scope: High Performance Cementitious Materials to Advance Expedient Repairs and Structural Hardening Priorities
10/28/20 → 10/27/23
Project: Research project
-
High Performance Cementitious Materials to Advance Expedient Repairs and Structural Hardening Priorities
10/28/20 → 10/27/23
Project: Research project
-
Mixed Rare Earth Oxides (REOs) and/or Salts (RESs) from Coal Based Resources
Groppo, J. & Hower, J.
Winner Water Services Incorporated
10/1/20 → 1/1/21
Project: Research project
-
Enhanced Depolarized Electro-Membrane System for Direct Capture of Carbon Dioxide from Ambient Air
Omosebi, A., Thompson, J. & Wang, J.
10/1/20 → 3/31/22
Project: Research project
-
Intensified Catalytic Conversion of Carbon Dioxide (CO2) into High Value Chemicals
Thompson, J., Gnanamani, M. K. & Omosebi, A.
10/1/20 → 3/31/23
Project: Research project
-
Hollow Carbon Fiber for Low-Cost High-Strength Compressed Gas Storage Tanks
Weisenberger, M., Andrews, R. & Morris, E.
10/1/20 → 9/30/23
Project: Research project
-
Hollow Carbon Fiber for Low-Cost High-Strength Compressed Gas Storage Tanks
Weisenberger, M., Andrews, R. & Morris, E.
10/1/20 → 9/30/23
Project: Research project
-
Electric Vehicle STEM Education Project
KY Energy and Environment Cabinet
9/16/20 → 6/30/21
Project: Research project
-
EPSCoR Research Infrastructure Improvement Program: RII Track-2 Focused EPSCoR Collaborations - Year 3
9/1/20 → 8/31/23
Project: Research project
-
RII Track-2 FEC: Data-enabled Discovery and Design to Transform Liquid-based Energy Storage (D3TaLES)
Risko, C., Eaton, D. & Odom, S.
9/1/20 → 8/31/21
Project: Research project
-
EPSCoR Research Infrastructure Improvement Program: RII Track-2 Focused EPSCoR Collaborations - Year 2
9/1/20 → 8/31/22
Project: Research project
-
Carbon Science Solutions Student Support for Rachel Kaplan
8/1/20 → 12/31/20
Project: Research project
-
SBIR Phase I: Army Phase I Thermoplastic High Modulus Support
7/16/20 → 12/31/20
Project: Research project
-
Paducah Gaseous Diffusion Plant C1948: CL 2: FY22 Paducah Gaseous Diffusion Plant
KY Cabinet for Health and Family Services
7/1/20 → 6/30/22
Project: Research project
-
FY21 Paducah Gaseous Diffusion Plant
KY Cabinet for Health and Family Services
7/1/20 → 6/30/21
Project: Research project
-
Site Remediation Maxey Flats C1949
KY Cabinet for Health and Family Services
7/1/20 → 6/30/21
Project: Research project
-
Site Remediation Maxey Flats C1949: CL 2: FY22 Maxey Flats Nuclear Disposal Site
KY Cabinet for Health and Family Services
7/1/20 → 6/30/22
Project: Research project
-
KY EPSCoR: RII Track-1: Kentucky Advanced Manufacturing Partnership for Enhanced Robotics and Structures FY21 & FY22
Andrews, R., Crawford, C. & Mossey, J.
7/1/20 → 6/30/23
Project: Research project
-
Beneficiation Technology Deep Dive: Manufactured Aggregates
Electric Power Research Institute
6/22/20 → 6/30/21
Project: Research project
-
Belite Cement, and Concretes; Novel Low-Energy Approaches to Making Concrete Extremely Durable
Jewell, R. & Robl, T.
1/1/20 → 1/9/20
Project: Research project
-
Belite Cement, and Concretes; Novel Low-Energy Approaches to Making Concrete Extremely Durable
Jewell, R. & Robl, T.
1/1/20 → 6/30/22
Project: Research project
-
Electric Vehicle STEM Project
KY Energy and Environment Cabinet
11/1/19 → 6/30/20
Project: Research project
-
SBIR [Phase II]: A15-008 SEQUENTIAL Low Thermal Conductivity Fiber for Solid Rocket Nozzle Insulation
Craddock, J. & Weisenberger, M.
10/12/19 → 6/17/22
Project: Research project
-
SBIR [Phase II]: A15-008 SEQUENTIAL Low Thermal Conductivity Fiber for Solid Rocket Nozzle Insulation
Craddock, J. & Weisenberger, M.
10/12/19 → 12/11/19
Project: Research project
-
-
-
KY EPSCoR: RII Track-1: Kentucky Advanced Manufacturing Partnership for Enhanced Robotics and Structures
Crawford, C., Mossey, J. & Andrews, R.
10/1/19 → 6/30/20
Project: Research project
-
SBIR Phase II: Targeted Pb Removal for Drinking Water Purification using INCION®
9/15/19 → 2/10/21
Project: Research project
-
Sorption Enhanced Mixed Matrix Membranes for Hydrogen (H2) Purification and Carbon Dioxide (CO2) Capture
Liu, K. & Placido, A.
Research Foundation of State University of New York
9/1/19 → 12/31/19
Project: Research project
-
UKy Carbon Fiber & Carbon Fiber Composite Manufacturing Support - Task 1
7/24/19 → 6/30/20
Project: Research project
-
KY EPSCoR: RII Track-1: Kentucky Advanced Manufacturing Partnership for Enhanced Robotics and Structures
Andrews, R., Crawford, C. & Mossey, J.
7/1/19 → 6/30/22
Project: Research project
-
-
KY EPSCoR: Powering the Kentucky Bioeconomy for a Sustainable Future
2/1/19 → 7/31/19
Project: Research project
-
KY EPSCoR: Powering the Kentucky Bioeconomy for a Sustainable Future
Andrews, R., Cheng, Y. & Vaillancourt, L.
2/1/19 → 7/31/19
Project: Research project
-
KY EPSCoR: Participant Support Scope - Powering the Kentucky Bioeconomy for a Sustainable Future
Vaillancourt, L. & Andrews, R.
2/1/19 → 7/31/19
Project: Research project
-
An Intensified Electro-Catalytic Process for Production of Formic Acid from Power Plant CO2 Emissions
Thompson, J., Liu, K., Omosebi, A. & Widger, L.
1/1/19 → 12/31/21
Project: Research project
-
NSF EPSCoR: Quantifying Soil Carbon Sequestration Potential of Conservation Management Practices Based on a Multi-scale Data Fusion Approach
Ren, W. & Andrews, R.
11/1/18 → 6/30/19
Project: Research project
-
Development and Testing of a High Temperature PBI Hollow Fiber Membrane Technology for Pre-Combustion CO2 Capture
Liu, K., Koumoulis, D., Caudill, L. & Placido, A.
11/1/18 → 12/31/22
Project: Research project
-
Advancing Post-Combustion CO2 Capture through Increased Mass Transfer and Lower Degradation
10/1/18 → 9/30/22
Project: Research project
-
N-ACTIVITY
Liu, K., Challman, D. & Placido, A.
Research Institute of Innovative Technology for the Earth
9/1/18 → 9/30/20
Project: Research project
-
-
Sawdust Briquetting to Facilitate Integration and Power Production in a Coal-Fired Utility Boiler
Keene, T., Medina, S., Smith, S. & Taulbee, D.
KY Energy and Environment Cabinet
8/1/18 → 6/30/19
Project: Research project
-
NSF EPSCoR: Powering the Kentucky Bioeconomy: Van Cleve Scope
8/1/18 → 7/31/19
Project: Research project
-
Sawdust Briquetting to Facilitate Integration and Power Production in a Coal-Fired Utility Boiler
Medina, S., Keene, T., Smith, S. & Taulbee, D.
KY Energy and Environment Cabinet
8/1/18 → 6/30/19
Project: Research project
-
NSF EPSCoR: Powering the Kentucky Bioeconomy for a Sustainable Future
Rodgers, D., Andrews, R. & Gentry, M.
8/1/18 → 7/31/19
Project: Research project
-
NSF EPSCoR: Powering the Kentucky Bioeconomy: Crofcheck Scope
8/1/18 → 7/31/19
Project: Research project
-
FY19-20 UK CAER Site Remediation Maxey Flats C1133
Hampson, S.
7/1/18 → 6/30/19
Project: Research project
-