Grants and Contracts per year
- 150 - 200 out of 540 results
Search results
-
Finished
FY19-20 UK CAER Site Remediation Maxey Flats C1133
Hampson, S.
7/1/18 → 6/30/19
Project: Research project
-
-
M-Activity
Liu, K., Challman, D. & Placido, A.
Research Institute of Innovative Technology for the Earth
7/1/18 → 12/31/18
Project: Research project
-
-
Carbon Management Research Group: Cost Share for 3200001820
Liu, K. & Landon, J.
5/1/18 → 12/31/18
Project: Research project
-
A Process with Decoupled Absorber Kinetics and Solvent Regeneration through Membrane Dewatering and In-Column Heat Transfer
Liu, K., Fan, Z. & Landon, J.
5/1/18 → 2/28/22
Project: Research project
-
IACMI Task 6.18: Preparation of Mesophase Pitch Feedstock for Carbon Fiber
5/1/18 → 6/30/19
Project: Research project
-
UKy-CAER Heat-Integrated Transformative CO2 Capture Process for Pulverized Coal Power Plants
Liu, K., Challman, D., Nikolic, H. & Thompson, J.
4/1/18 → 8/31/19
Project: Research project
-
Phase II: UKy-CAER Heat-integrated Transformative CO2 Capture Process for Pulverized Coal Power Plants
4/1/18 → 5/31/21
Project: Research project
-
Carbon Management Research Group: Cost Share for 3200001777
4/1/18 → 12/31/18
Project: Research project
-
-
Intensified Flue Gas Desulfurization Water Treatment for Reuse, Solidification, and Discharge
Omosebi, A., Landon, J., Liu, K. & Gao, X.
1/22/18 → 1/21/20
Project: Research project
-
Intensified Flue Gas Desulfurization Water Treatment for Reuse, Solidification, and Discharge
Gao, X., Landon, J., Liu, K. & Omosebi, A.
1/22/18 → 1/21/20
Project: Research project
-
Development of Solution Spun Bio-Derived Carbon Fiber from Fractionated Lignin
Morris, E. & Weisenberger, M.
1/1/18 → 5/31/19
Project: Research project
-
Gasification Combined Heat and Power from Coal Fines
Liu, K., Challman, D., Groppo, J. & Nikolic, H.
12/6/17 → 9/30/19
Project: Research project
-
Staged Opposed Multi Burner (OMB) for Modular Gasifier/Burner
Andrews, R., Challman, D., Fan, Z. & Liu, K.
12/1/17 → 5/31/21
Project: Research project
-
SBIR [Phase II]: In-Plane Conductivity Improvement to Fiber Reinforced Composite Materials
10/4/17 → 3/22/20
Project: Research project
-
NSF EPSCoR: Library Strategy for Determining Post-Translational Modification Specificity
9/18/17 → 7/31/18
Project: Research project
-
NSF EPSCoR: Using Pyrolysis-Gas Chromatography-Mass Spectrometry to Model, Understand and Improve the Thermal Conversion of Lignocellulosic Biomass to Fuel
Crocker, M. & Andrews, R.
9/18/17 → 7/31/19
Project: Research project
-
SBIR [Phase I]: Anode Modification to Target Pb Removal for Drinking Water Purification using Inverted Capacitive Deionization
9/15/17 → 2/28/19
Project: Research project
-
NSF EPSCoR: Expanding Your Horizons - a STEM Conference for Middle School Girls
Agouridis, C., Andrews, R., Crocker, E., Hirsch, R., Odom, S., Williams, F., Kim, S. & Van Cleve, J.
9/1/17 → 6/30/19
Project: Research project
-
Precursor Processing Development for Low Cost, High Strength Carbon Fiber for Composite Overwrapped Pressure Vessel Applications
Weisenberger, M. & Morris, E.
Energy Efficiency and Renewable Energy
9/1/17 → 12/31/20
Project: Research project
-
NSF EPSCoR: Expanding Your Horizons - a STEM Conference for Middle School Girls
Agouridis, C., Andrews, R., Crocker, E., Hirsch, R., Odom, S., Williams, F., Kim, S. & Van Cleve, J.
9/1/17 → 6/30/19
Project: Research project
-
Carbon Management Research Group: Cost Share for 3048111999
8/15/17 → 9/30/18
Project: Research project
-
Development of a Solution Spinning Process for Disentangled UHMWPE (DPE) Fiber
Morris, E. & Weisenberger, M.
8/1/17 → 6/29/18
Project: Research project
-
Zeolite Membrane Reactor for Pre-Combustion Carbon Dioxide Capture
Liu, K. & Placido, A.
8/1/17 → 12/31/19
Project: Research project
-
Use of Spray Dryer Ash Material in Concrete Applications
Jewell, R., Oberlink, A. & Robl, T.
Electric Power Research Institute
5/18/17 → 12/31/20
Project: Research project
-
SBIR [Phase II]: Low Thermal Conductivity Fiber for Solid Rocket Nozzle Insulation
4/7/17 → 6/15/19
Project: Research project
-
Carbon Management Research Group: Cost Share for 3200000168
Liu, K. & Neathery, J.
3/31/17 → 9/30/18
Project: Research project
-
-
-
SBIR [Phase II]: Continuous Synthesis of Short, Well-Aligned, N-MWCNTs
2/15/17 → 9/15/19
Project: Research project
-
Carbonization of New Cellulosic Wovens for Advanced Thermal Composites
Weisenberger, M. & Craddock, J.
2/6/17 → 8/31/17
Project: Research project
-
Demonstration Project for Post Combustion CO2 Capture Process (Third Generation, Energy Saving and Compact) for Coal-Fired Power Plant
1/1/17 → 12/31/21
Project: Research project
-
Utilization Potential of Rain Carbon Dry FGD Material
Jewell, R., Duvallet, T. & Oberlink, A.
1/1/17 → 3/31/18
Project: Research project
-
REU: SusChEM: Promotion of Nickel Catalysts for the Conversion of Biomass-derived Oils to Fuel-like Hydrocarbons
Crocker, M. & Santillan-Jimenez, E.
12/23/16 → 12/31/17
Project: Research project
-
Guidelines for Assessing CCPs in Pond and Landfills for Beneficial Use
Robl, T., Jewell, R. & Oberlink, A.
Electric Power Research Institute
12/6/16 → 12/31/17
Project: Research project
-
Identification and Characterization of Coal and Coal By-Products Containing High Rare Earth Element Concentrations
Groppo, J., Eble, C., Honaker, R. & Hower, J.
10/1/16 → 4/30/18
Project: Research project
-
-
KY EPSCoR: Expanding Your Horizons - a STEM Conference for Middle School Girls
Crocker, E., Andrews, R., Condon, B. & Odom, S.
KY Council on Postsecondary Education
9/1/16 → 6/30/17
Project: Research project
-
Carbon Management Research Group: Cost Share for 3200000548
Liu, K., Chen, L. & Lippert, C.
9/1/16 → 12/31/18
Project: Research project
-
SBIR [Phase I]: Low Thermal Conductivity Fiber for Solid Rocket Nozzle Insulation
8/15/16 → 11/30/16
Project: Research project
-
-
KY EPSCoR: Integrating Collegiate Ecological and Molecular Research into the K-12 STEM Curriculum
Hirsch, R., Andrews, R., McCulley, R., Schardl, C. & White, J.
KY Council on Postsecondary Education
8/1/16 → 7/31/17
Project: Research project
-
Maintain Risk Based Data Management System (RBDMS)
Lambert, S. & Corbin, J.
KY Energy and Environment Cabinet
7/1/16 → 6/30/17
Project: Research project
-
KSEF RDE: Safe, Low-cost High Energy Density Dual Ion Battery
Lipka, S. & Swartz, C.
KY Science and Technology Co Inc
7/1/16 → 10/21/16
Project: Research project
-
-
Institute for Advanced Composites Manufacturing Innovation
Weisenberger, M., Cheng, Y., Craddock, J. & Morris, E.
5/1/16 → 1/31/17
Project: Research project
-
US-China Clean Energy Research Center (CERC II), Advanced Coal Technologies Consortium
Liu, K., Challman, D., Crocker, M., Chen, L. & Lippert, C.
4/1/16 → 4/30/21
Project: Research project
-
US-China Clean Energy Research Center (CERC II), Algae Scope
Crocker, M., Challman, D. & Liu, K.
4/1/16 → 4/30/21
Project: Research project