Grants and Contracts per year
- 1 - 50 out of 474 results
Search results
-
Finished
CO2 Capture at LG&E Cane Run NGCC Power Plant
Electric Power Research Institute
12/22/22 → 12/22/22
Project: Research project
-
-
Innovative Design of a Sorbent-Mineralization Technology; Addressing Industrial CO2 Capture for Value-Added Industrial
11/21/22 → 12/31/22
Project: Research project
-
Circular Economy Approach for Recycling End-of-Life Solar Panels
11/21/22 → 12/31/22
Project: Research project
-
Electrochemically Regenerated Solvent for Direct Air Capture with Cogeneration of Hydrogen at Bench-scale
Liu, K., Gao, X., Omosebi, A. & Renfro, M.
9/1/22 → 8/31/23
Project: Research project
-
Porous, Lightweight, and Semiconducting Chalcogel asHigh Energy Density Electrode for Lithium-ion and Sodium-ion Batteries
9/1/22 → 8/31/23
Project: Research project
-
Production of Mesophase Pitch from Athebasca Oil Sands Derived Asphaltene by Catalytic Desulfurization
8/1/22 → 2/24/23
Project: Research project
-
Performance Analysis of Solar Farm at E.W. Brown Power Generation Station
7/1/22 → 6/30/23
Project: Research project
-
Paducah Gaseous Diffusion Plant
KY Cabinet for Health and Family Services
7/1/22 → 6/30/23
Project: Research project
-
Paducah Gaseous Diffusion Plant
KY Cabinet for Health and Family Services
7/1/22 → 6/30/23
Project: Research project
-
KY EPSCoR FY23 & FY24: RII Track-1: Kentucky Advanced Manufacturing Partnership for Enhanced Robotics and Structures
7/1/22 → 6/30/23
Project: Research project
-
Dual-Loop Aqueous CCS for Net Negative CO2 Emissions with Lower Costs
7/1/22 → 7/31/23
Project: Research project
-
Site Remediation Maxey Flats C1949
KY Cabinet for Health and Family Services
7/1/22 → 6/30/23
Project: Research project
-
-
Coal Ash Quality, Beneficiation Technology, and Concrete Applications Evaluation
Scrubgrass Reclamation Company LP
4/1/22 → 10/10/22
Project: Research project
-
Phase 2: Multifilament Spinning of PEDOT Fibers: Electrical Conductivity Stability
Weisenberger, M. & Sarabia-Riquelme, R.
3/15/22 → 2/28/23
Project: Research project
-
-
Fisher-Tropsch Catalyst Testing - Two 28-day Runs + Options for 14-day extensions
10/25/21 → 12/31/21
Project: Research project
-
Sustainable Aviation Fuel Production via Decarboxylation/Decarbonylation of Low-Cost and Geographically Distributed Oleaginous Feedstock
Santillan-Jimenez, E. & Pace, R.
10/1/21 → 9/30/22
Project: Research project
-
Illinois Basin Carbon Ore, Rare Earth, and Critical Minerals (IB-CORE-CM) Initiative
Honaker, R., Agioutantis, Z., Andrews, R., Groppo, J., Hower, J., Jewell, R., Weisenberger, M., Werner, J. & Silva Castro, J.
Illinois State Geological Survey
9/21/21 → 9/20/23
Project: Research project
-
Dual-Loop Aqueous CCS for Net Negative CO2 Emissions with Lower Costs
8/1/21 → 7/30/23
Project: Research project
-
Scope account: Development and Characterization of Densified Biomass-plastic Blend for Entrained Flow Gasification
Liu, K., Nikolic, H., Shi, J. & Caudill, L.
8/1/21 → 7/31/23
Project: Research project
-
Third Party Cost Share: Development and Characterization of Densified Biomass-plastic Blend for Entrained Flow Gasification
Liu, K., Caudill, L., Nikolic, H. & Shi, J.
8/1/21 → 7/31/23
Project: Research project
-
Utilization Potential of Ponded and Landfilled Coal Ash Blended Waste Ceramics
Vecor Technologies Pty Limited
7/1/21 → 3/31/22
Project: Research project
-
KY EPSCoR: URE Scope: Robotic Mapping of Magnetic Fields in a Magnetically Shielded Environment
Crawford, C., Mossey, J. & Andrews, R.
7/1/21 → 6/30/22
Project: Research project
-
Electric Vehicle STEM Education Project
KY Energy and Environment Cabinet
7/1/21 → 6/30/22
Project: Research project
-
Utilization Potential of Ponded and Landfilled Coal Ash Blended Waste Ceramics
7/1/21 → 7/2/21
Project: Research project
-
-
Economical Production of Rare Earth Oxides from Coal Ash and Other Feedstocks on Commercial Scale
Groppo, J. & Hower, J.
Winner Water Services Incorporated
5/3/21 → 12/29/21
Project: Research project
-
Wabash Hydrogen Negative Emissions Technology Demonstration
Liu, K. & Caudill, L.
4/30/21 → 2/28/22
Project: Research project
-
-
University Coalition for Fossil Energy Research
The Pennsylvania State University
2/1/21 → 1/31/23
Project: Research project
-
-
Bench Scale Testing of a High Efficiency, Ultra-Compact Process for Pre-Combustion Co2 Capture
Liu, K., Koumoulis, D. & Caudill, L.
University of Southern California
12/1/20 → 12/31/22
Project: Research project
-
Intensified Catalytic Conversion of Carbon Dioxide (CO2) into High Value Chemicals
Thompson, J., Gnanamani, M. K. & Omosebi, A.
10/1/20 → 3/31/23
Project: Research project
-
Enhanced Depolarized Electro-Membrane System for Direct Capture of Carbon Dioxide from Ambient Air
Omosebi, A., Thompson, J. & Wang, J.
10/1/20 → 3/31/22
Project: Research project
-
Mixed Rare Earth Oxides (REOs) and/or Salts (RESs) from Coal Based Resources
Groppo, J. & Hower, J.
Winner Water Services Incorporated
10/1/20 → 1/1/21
Project: Research project
-
Electric Vehicle STEM Education Project
KY Energy and Environment Cabinet
9/16/20 → 6/30/21
Project: Research project
-
EPSCoR Research Infrastructure Improvement Program: RII Track-2 Focused EPSCoR Collaborations - Year 3
9/1/20 → 8/31/23
Project: Research project
-
RII Track-2 FEC: Data-enabled Discovery and Design to Transform Liquid-based Energy Storage (D3TaLES)
Risko, C., Eaton, D. & Odom, S.
9/1/20 → 8/31/21
Project: Research project
-
EPSCoR Research Infrastructure Improvement Program: RII Track-2 Focused EPSCoR Collaborations - Year 2
9/1/20 → 8/31/22
Project: Research project
-
Carbon Science Solutions Student Support for Rachel Kaplan
8/1/20 → 12/31/20
Project: Research project
-
SBIR Phase I: Army Phase I Thermoplastic High Modulus Support
7/16/20 → 12/31/20
Project: Research project
-
Paducah Gaseous Diffusion Plant C1948: CL 2: FY22 Paducah Gaseous Diffusion Plant
KY Cabinet for Health and Family Services
7/1/20 → 6/30/22
Project: Research project
-
Site Remediation Maxey Flats C1949
KY Cabinet for Health and Family Services
7/1/20 → 6/30/21
Project: Research project
-
Site Remediation Maxey Flats C1949: CL 2: FY22 Maxey Flats Nuclear Disposal Site
KY Cabinet for Health and Family Services
7/1/20 → 6/30/22
Project: Research project
-
KY EPSCoR: RII Track-1: Kentucky Advanced Manufacturing Partnership for Enhanced Robotics and Structures FY21 & FY22
Andrews, R., Crawford, C. & Mossey, J.
7/1/20 → 6/30/23
Project: Research project
-
FY21 Paducah Gaseous Diffusion Plant
KY Cabinet for Health and Family Services
7/1/20 → 6/30/21
Project: Research project
-
Beneficiation Technology Deep Dive: Manufactured Aggregates
Electric Power Research Institute
6/22/20 → 6/30/21
Project: Research project