Projects and Grants per year
- 1 - 50 out of 54 results
Search results
-
Active
SPR 25-662, Retrofit Design of Seismically Deficient Bridges on and Over the Interstates and Parkways in Western Kentucky
Harik, I. (PI) & Peiris, N. (CoI)
7/1/24 → 6/30/26
Project: Research project
-
SPR 25-661, Concrete Patching Methods
Peiris, N. (PI), Goff, C. (CoI) & Palle, S. (CoI)
7/1/24 → 6/30/26
Project: Research project
-
SPR 2025 Prime
Kreis, S. (PI), Asher, J. (CoI), Ashurst, K. (CoI), Baskette, R. (CoI), Beaven, B. (CoI), Blackden, C. (CoI), Blandford, B. (CoI), Brown, M. (CoI), Catchings, R. (CoI), Caudill, R. (CoI), Chen, M. (CoI), Clay-Young, P. (CoI), Creech, J. (CoI), Dadi, G. (CoI), Fields, M. (CoI), Gibson, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Griffith, R. (CoI), Hacker, D. (CoI), Harik, I. (CoI), Horseman, M. (CoI), Howell, B. (CoI), Jasper, J. (CoI), Keathley, C. (CoI), Kirk, A. (CoI), Koo, J. (CoI), Leddy, D. (CoI), Li, Y. (CoI), Li, X. (CoI), Marks, P. (CoI), Martin, S. (CoI), Miles, J. (CoI), Moses, W. (CoI), Nassereddine, H. (CoI), Palle, S. (CoI), Paris, B. (CoI), Peiris, N. (CoI), Ross, P. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Staats, W. (CoI), Staats, E. (CoI), Sun, L. (CoI), Taylor, T. (CoI), Thompson, T. (CoI), VanDyke, C. (CoI), Waddle, S. (CoI), Wallace, C. (CoI), Walton, J. (CoI), Wang, T. (CoI), Wilcoxson, J. (CoI) & Zhang, X. (CoI)
7/1/24 → 6/30/26
Project: Research project
-
SPR 25-663, Bridge Load Posting Based on Load Testing (Phase 2)
Peiris, N. (PI) & Harik, I. (CoI)
6/1/24 → 6/30/25
Project: Research project
-
KHIT 160, Strengthening Corrosion Damaged RC Girders (067B00075N # KY-15X over North Fork KY River in Letcher County, D12)
Peiris, N. (PI) & Harik, I. (CoI)
11/15/23 → 6/30/26
Project: Research project
-
SPR 24-656: Seismic Vulnerability Assessments of Bridges in Kentucky for Compliance with FHWA’s 2022 Specifications
Harik, I. (PI) & Peiris, N. (CoI)
7/1/23 → 6/30/26
Project: Research project
-
SPR 24-654: Corrosion Performance Overview of Existing Concrete Reinforcement Options
Palle, S. (PI) & Peiris, N. (CoI)
7/1/23 → 6/30/25
Project: Research project
-
SPR 24-656: Seismic Vulnerability Assessments of Bridges in Kentucky for Compliance with FHWA’s 2022 Specifications
Harik, I. (PI) & Peiris, N. (CoI)
7/1/23 → 6/30/26
Project: Research project
-
SPR PRIME 2024
Kreis, S. (PI), Asher, J. (CoI), Ashurst, K. (CoI), Baskette, R. (CoI), Beaven, B. (CoI), Blackden, C. (CoI), Blandford, B. (CoI), Brown, M. (CoI), Catchings, R. (CoI), Caudill, R. (CoI), Chen, M. (CoI), Clay-Young, P. (CoI), Creech, J. (CoI), Dadi, G. (CoI), Erhardt, G. (CoI), Fields, M. (CoI), Gibson, J. (CoI), Goff, C. (CoI), Graves, R. (CoI), Green, E. (CoI), Griffith, R. (CoI), Harik, I. (CoI), Jasper, J. (CoI), Kirk, A. (CoI), Koo, J. (CoI), Li, Y. (CoI), Marks, P. (CoI), Martin, S. (CoI), McIntosh, D. (CoI), Miles, J. (CoI), Moses, W. (CoI), Nassereddine, H. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Ross, P. (CoI), Sandlin, A. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Staats, W. (CoI), Staats, E. (CoI), Stamatiadis, N. (CoI), Sun, L. (CoI), VanDyke, C. (CoI), Waddle, S. (CoI), Wallace, C. (CoI), Walton, J. (CoI), Wang, T. (CoI), Wilcoxson, J. (CoI) & Zhang, X. (CoI)
7/1/23 → 6/30/26
Project: Research project
-
SPR PRIME FY2023
Kreis, S. (PI), Asher, J. (CoI), Ashurst, K. (CoI), Baskette, R. (CoI), Beaven, B. (CoI), Blackden, C. (CoI), Blandford, B. (CoI), Catchings, R. (CoI), Caudill, R. (CoI), Chen, M. (CoI), Clay-Young, P. (CoI), Creech, J. (CoI), Dadi, G. (CoI), Erhardt, G. (CoI), Fields, M. (CoI), Gibson, J. (CoI), Goff, C. (CoI), Graves, R. (CoI), Green, E. (CoI), Griffith, R. (CoI), Harik, I. (CoI), Howell, B. (CoI), Jasper, J. (CoI), Kirk, A. (CoI), Koo, J. (CoI), Marks, P. (CoI), Martin, S. (CoI), McIntosh, D. (CoI), Miles, J. (CoI), Moses, W. (CoI), Nassereddine, H. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Ross, P. (CoI), Scully, T. (CoI), Smith, S. (CoI), Souleyrette, R. (CoI), Staats, E. (CoI), Staats, W. (CoI), Stamatiadis, N. (CoI), Sun, L. (CoI), VanDyke, C. (CoI), Waddle, S. (CoI), Wallace, C. (CoI), Walton, J. (CoI), Wang, T. (CoI), Wilcoxson, J. (CoI), Zhang, X. (CoI) & Rister, B. (Former CoI)
7/1/22 → 6/30/26
Project: Research project
-
KHIT 146: Retrofit of Impact Damaged PC I-Girder With CatStrong Carbon Fabrics (105B00143N - US 460 over I-75 - Scott County, D07)
Peiris, N. (PI) & Harik, I. (CoI)
1/1/22 → 6/30/25
Project: Research project
-
SPR Prime FY2022
Kreis, S. (PI), Ashurst, K. (CoI), Baskette, R. (CoI), Baskette, R. (CoI), Beaven, B. (CoI), Blackden, C. (CoI), Blandford, B. (CoI), Catchings, R. (CoI), Chen, M. (CoI), Clay-Young, P. (CoI), Creech, J. (CoI), Dadi, G. (CoI), Erhardt, G. (CoI), Fields, M. (CoI), Gibson, J. (CoI), Goff, C. (CoI), Graves, R. (CoI), Green, E. (CoI), Griffith, R. (CoI), Harik, I. (CoI), Howell, B. (CoI), Jasper, J. (CoI), Kirk, A. (CoI), Koo, J. (CoI), Marks, P. (CoI), Marks, P. (CoI), Martin, S. (CoI), Moses, W. (CoI), Nassereddine, H. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Ross, P. (CoI), Scully, T. (CoI), Smith, S. (CoI), Souleyrette, R. (CoI), Staats, E. (CoI), Staats, W. (CoI), Stamatiadis, N. (CoI), Stromberg, A. (CoI), Sun, L. (CoI), VanDyke, C. (CoI), Waddle, S. (CoI), Wallace, C. (CoI), Walton, J. (CoI), Wang, T. (CoI), Wilcoxson, J. (CoI), Zhang, X. (CoI), Grady, E. (Former CoI), Rister, B. (Former CoI), Taylor, T. (Former CoI) & Wolfe, R. (Former CoI)
7/1/21 → 6/30/25
Project: Research project
-
SPR Prime FY2021
Kreis, S. (PI), Ashurst, K. (CoI), Baskette, R. (CoI), Baskette, R. (CoI), Beaven, B. (CoI), Blackden, C. (CoI), Blandford, B. (CoI), Catchings, R. (CoI), Chen, M. (CoI), Clay-Young, P. (CoI), Creech, J. (CoI), Dadi, G. (CoI), Erhardt, G. (CoI), Fields, M. (CoI), Gibson, J. (CoI), Goff, C. (CoI), Graves, R. (CoI), Green, E. (CoI), Griffith, R. (CoI), Harik, I. (CoI), Horseman, M. (CoI), Howell, B. (CoI), Jasper, J. (CoI), Jones, T. (CoI), Kirk, A. (CoI), Lewis, R. (CoI), Marks, P. (CoI), Marks, P. (CoI), Martin, S. (CoI), McIntosh, D. (CoI), Nassereddine, H. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Pope, C. (CoI), Ross, P. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Staats, E. (CoI), Staats, W. (CoI), Stamatiadis, N. (CoI), Stromberg, A. (CoI), Sun, L. (CoI), VanDyke, C. (CoI), Waddle, S. (CoI), Wallace, C. (CoI), Walton, J. (CoI), Wang, T. (CoI), Zhang, X. (CoI), Agent, K. (Former CoI), Crabtree, J. (Former CoI), Grady, E. (Former CoI), Kissick, J. (Former CoI), Rister, B. (Former CoI) & Taylor, T. (Former CoI)
7/1/20 → 6/30/25
Project: Research project
-
Finished
KHIT 143, Rapid Field Testing and Load Rating of Steel Girder Bridge without Design Plans (008B00098N-KY 237 over Tributary to Gunpowder Creek, Boon Co., KY)
Peiris, N. (PI) & Harik, I. (CoI)
7/20/21 → 7/30/22
Project: Research project
-
KHIT 142, Retrofit of Impact RCDG Bridge Girders using CatStrong UCF (089B00085N-KY over Western KY Pkwy Bridge in Muhlenberg County, D02)
Peiris, N. (PI) & Harik, I. (CoI)
7/10/21 → 6/30/24
Project: Research project
-
KHIT 141, Deployment of CatStrong UCF to Retrofit Damaged PC Girders (105B00107R # KY-620 over I-75 in Scott County, D07)
Peiris, N. (PI) & Harik, I. (CoI)
6/15/21 → 6/30/24
Project: Research project
-
SPR 21-607: Rapid Pothole Repair in Concrete Bridge Decks
Peiris, N. (PI) & Harik, I. (CoI)
7/1/20 → 8/31/22
Project: Research project
-
KHIT 135, Field Testing and Load Rating of the KY 676 Post-Tensioned Segmental Bridge (037B00074N - KY 676 Over Kentucky River in Franklin Co.
Peiris, N. (PI) & Harik, I. (CoI)
12/1/19 → 6/30/22
Project: Research project
-
RFP, NCHRP 20-07/Task 428: Update of the 2012 AASHTO Guide Specifications for the Design of Bonded FRP Systems for the Repair and Strengthening of Concrete Bridge Elements
Harik, I. (PI) & Peiris, N. (CoI)
9/3/19 → 7/30/21
Project: Research project
-
KHIT 131, Retrofit of Bridge Pier Caps with CatStrong UCF (Piers 6, 7, 8, & 13 - 073B00001N - US 45 Over Ohio River Bridge in McCracken Co., KY)
Harik, I. (PI) & Peiris, N. (CoI)
7/1/19 → 6/30/22
Project: Research project
-
SPR 20-593: Bridge Load Posting Based on Load Testing
Peiris, N. (PI) & Harik, I. (CoI)
7/1/19 → 6/30/24
Project: Research project
-
KHIT 128, Deployment of CatStrong TCW and TCF for Retrofit of Timber Pier Piles (064B00019N & 064B00049N - Lawrence Co., D12)
Harik, I. (PI) & Peiris, N. (CoI)
5/15/19 → 6/30/22
Project: Research project
-
KHIT 127, Retrofit of Cracked Ends in PC I-Girders, I-69 Panther Creek, Clarks River, Graves County
Harik, I. (PI) & Peiris, N. (CoI)
10/15/18 → 6/30/23
Project: Research project
-
KHIT 126, Retrofit of Impacted Bridge Girders (039B00017N - KY 562 over I-71, Gallatin County
Harik, I. (PI) & Peiris, N. (CoI)
10/1/18 → 6/30/22
Project: Research project
-
SPR Prime 2019
Kreis, S. (PI), Ashurst, K. (CoI), Baskette, R. (CoI), Baskette, R. (CoI), Blackden, C. (CoI), Blandford, B. (CoI), Chen, M. (CoI), Clay-Young, P. (CoI), Dadi, G. (CoI), Erhardt, G. (CoI), Gibson, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Harik, I. (CoI), Howell, B. (CoI), Kirk, A. (CoI), Martin, S. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Staats, E. (CoI), Staats, W. (CoI), Stamatiadis, N. (CoI), Sun, L. (CoI), VanDyke, C. (CoI), Waddle, S. (CoI), Wallace, C. (CoI), Walton, J. (CoI), Agent, K. (Former CoI), Albright, N. (Former CoI), Beckham, T. (Former CoI), Crabtree, J. (Former CoI), Hopwood, T. (Former CoI), Kissick, J. (Former CoI), Lewis, R. (Former CoI), Pigman, J. (Former CoI), Rister, B. (Former CoI), Sturgill, R. (Former CoI) & Taylor, T. (Former CoI)
7/1/18 → 6/30/23
Project: Research project
-
SPR PRIME FY20
Kreis, S. (PI), Ashurst, K. (CoI), Baskette, R. (CoI), Baskette, R. (CoI), Blackden, C. (CoI), Blandford, B. (CoI), Catchings, R. (CoI), Chen, M. (CoI), Creech, J. (CoI), Dadi, G. (CoI), Fields, M. (CoI), Graves, R. (CoI), Green, E. (CoI), Harik, I. (CoI), Howell, B. (CoI), Jones, T. (CoI), Kirk, A. (CoI), Marks, P. (CoI), Marks, P. (CoI), Martin, S. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Ross, P. (CoI), Scully, T. (CoI), Stamatiadis, N. (CoI), Sun, L. (CoI), Wallace, C. (CoI), Walton, J. (CoI), Agent, K. (Former CoI), Beckham, T. (Former CoI), Clay-Young, P. (Former CoI), Crabtree, J. (Former CoI), Erhardt, G. (Former CoI), Gibson, J. (Former CoI), Grady, E. (Former CoI), Jasper, J. (Former CoI), Kissick, J. (Former CoI), Lewis, R. (Former CoI), McIntosh, D. (Former CoI), Nassereddine, H. (Former CoI), Rister, B. (Former CoI), Souleyrette, R. (Former CoI), Staats, E. (Former CoI), Staats, W. (Former CoI), Taylor, T. (Former CoI), VanDyke, C. (Former CoI), Waddle, S. (Former CoI) & Zhang, X. (Former CoI)
7/1/18 → 6/30/24
Project: Research project
-
KHIT 123: KY1057 Bridge Girder Retrofit Using CatStrong UCF and TCF, Powell County
Harik, I. (PI) & Peiris, N. (CoI)
6/25/18 → 6/30/22
Project: Research project
-
KHIT 119: Deployment of CatStrong UCF for Retrofit of PC Box Beams
Harik, I. (PI) & Peiris, N. (CoI)
5/1/18 → 6/30/21
Project: Research project
-
KHIT 113: Initial CatStrong Deployment for Bridge Retrofit Three KYTC Districts
Harik, I. (PI) & Peiris, N. (CoI)
7/1/17 → 6/30/23
Project: Research project
-
KHIT 116: Deployment of Catstrong UCF & TCF to Retrofit Deteriorated Pier Cap 006B00048L&R - I-64 over Kendall Springs Road and Licking River in Bath Count, D09
Harik, I. (PI) & Peiris, N. (CoI)
7/1/17 → 6/30/20
Project: Research project
-
SPR Prime 2018
Kreis, S. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Blandford, B. (CoI), Chen, M. (CoI), Dadi, G. (CoI), Erhardt, G. (CoI), Gibson, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Harik, I. (CoI), Howell, B. (CoI), Jasper, J. (CoI), Kirk, A. (CoI), Martin, S. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Staats, E. (CoI), Staats, W. (CoI), Sun, L. (CoI), VanDyke, C. (CoI), Waddle, S. (CoI), Wallace, C. (CoI), Walton, J. (CoI), Albright, N. (Former CoI), Crabtree, J. (Former CoI), Hopwood, T. (Former CoI), Hunsucker, D. (Former CoI), Kissick, J. (Former CoI), Pigman, J. (Former CoI), Rister, B. (Former CoI), Sturgill, R. (Former CoI) & Taylor, T. (Former CoI)
7/1/17 → 6/30/23
Project: Research project
-
KHIT 104, First Deployment of Multi-Layered CatStrong UCF to Retrofit Impacted PC I-Girder
Harik, I. (PI) & Peiris, N. (CoI)
10/15/16 → 6/30/20
Project: Research project
-
SPR 17 Prime
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Blandford, B. (CoI), Chen, M. (CoI), Dadi, G. (CoI), Gibson, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Harik, I. (CoI), Howell, B. (CoI), Kirk, A. (CoI), Kreis, S. (CoI), Martin, S. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Rister, B. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Spellman, M. (CoI), Sun, L. (CoI), Taylor, T. (CoI), VanDyke, C. (CoI), Wallace, C. (CoI), Walton, J. (CoI), Fields, M. (Former CoI), Hopwood, T. (Former CoI), Hunsucker, D. (Former CoI), Kissick, J. (Former CoI), McCormack, S. (Former CoI), Pigman, J. (Former CoI) & Sturgill, R. (Former CoI)
7/1/16 → 6/30/21
Project: Research project
-
KHIT 101, Retrofit of Pier Impact Damage using CatStrong UCF and TCF
Harik, I. (PI) & Peiris, N. (CoI)
11/10/15 → 6/30/18
Project: Research project
-
KHIT 100, High Performance CatStrong CRP Deployment to Retrofit a RCDG Bridge for Overheight Impact
Harik, I. (PI) & Peiris, N. (CoI)
11/1/15 → 6/30/18
Project: Research project
-
FRT 206, Development and Deployment of FRP for Bridge Substructure Retrofit
Harik, I. (PI) & Peiris, N. (CoI)
12/1/14 → 6/30/16
Project: Research project
-
KHIT 95, W.H. Natcher Pkwy. over US 68 Bridge Retrofit using CatStrong CRP and TCF, WarrenCounty, KY
Harik, I. (PI) & Peiris, N. (CoI)
11/1/14 → 6/30/18
Project: Research project
-
KHIT 94, Retrofit Using CatStrong UCF on KY 562 over I-71 Bridge in Gallatin Co., KY
Harik, I. (PI) & Peiris, N. (CoI)
9/1/14 → 6/30/18
Project: Research project
-
SPR 2015 Prime KTC
Crabtree, J. (PI), Agarwal, N. (CoI), Agent, K. (CoI), Ashurst, K. (CoI), Blandford, B. (CoI), Chen, M. (CoI), Dadi, G. (CoI), Fields, M. (CoI), Gibson, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Howell, B. (CoI), Kirk, A. (CoI), Kissick, J. (CoI), Kreis, S. (CoI), Martin, S. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Rister, B. (CoI), Rose, J. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Stamatiadis, N. (CoI), Sturgill, R. (CoI), Sun, L. (CoI), Taylor, T. (CoI), Walton, J. (CoI), Hopwood, T. (Former CoI), Hunsucker, D. (Former CoI), O'Connell, L. (Former CoI), Pigman, J. (Former CoI) & Ripy, J. (Former CoI)
7/1/14 → 6/30/19
Project: Research project
-
SPR 2016 Prime
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Blandford, B. (CoI), Chen, M. (CoI), Gibson, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Harik, I. (CoI), Howell, B. (CoI), Kirk, A. (CoI), Kissick, J. (CoI), Kreis, S. (CoI), Martin, S. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Rister, B. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Spellman, M. (CoI), Stamatiadis, N. (CoI), Sturgill, R. (CoI), Sun, L. (CoI), Taylor, T. (CoI), VanDyke, C. (CoI), Wallace, C. (CoI), Walton, J. (CoI), Agarwal, N. (Former CoI), Fields, M. (Former CoI), Hopwood, T. (Former CoI), Hunsucker, D. (Former CoI), McCormack, S. (Former CoI), O'Connell, L. (Former CoI) & Pigman, J. (Former CoI)
7/1/14 → 6/30/19
Project: Research project
-
KHIT 87, Retrofit of I-64 Pier Caps/Walkways over River Road,Louisville, KY
Harik, I. (PI) & Peiris, N. (CoI)
5/12/14 → 6/30/14
Project: Research project
-
KHIT 87,Retrofit of I-64 Pier Caps/Walkways over River Road, Louisville, KY
Harik, I. (PI) & Peiris, N. (CoI)
5/12/14 → 6/30/18
Project: Research project
-
KHIT 88, Retrofit of KY 583 Bridge over Blue Grass Pkwy, Hardin County, KY
Harik, I. (PI) & Peiris, N. (CoI)
3/1/14 → 6/30/14
Project: Research project
-
KHIT 86,Adjacent PPC I-beam Bridge with High Performance Materials
Harik, I. (PI) & Peiris, N. (CoI)
3/1/14 → 6/30/14
Project: Research project
-
KHIT 88, Retrofit of KY 583 Bridge over Blue Grass Pkwy, Hardin County, KY
Harik, I. (PI) & Peiris, N. (CoI)
3/1/14 → 6/30/17
Project: Research project
-
KHIT 86,Adjacent PPC I-beam Bridge with High Performance Materials
Harik, I. (PI) & Peiris, N. (CoI)
3/1/14 → 6/30/19
Project: Research project
-
SPR 2014 Prime KTC
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Chen, M. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hartman, D. (CoI), Hopwood, T. (CoI), Hunsucker, D. (CoI), Kirk, A. (CoI), Kreis, S. (CoI), McCormack, S. (CoI), O'Connell, L. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Pigman, J. (CoI), Ripy, J. (CoI), Rister, B. (CoI), Rose, J. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Stamatiadis, N. (CoI), Sun, L. (CoI), Taylor, T. (CoI), Wallace, C. (CoI) & Walton, J. (CoI)
7/1/13 → 6/30/14
Project: Research project
-
FRT 198, Load Rating of Bridge Size Culverts
Harik, I. (PI) & Peiris, N. (CoI)
5/1/13 → 6/30/14
Project: Research project
-
FRT 198, Load Rating of Bridge Size Culverts
Harik, I. (PI) & Peiris, N. (CoI)
5/1/13 → 10/31/19
Project: Research project
-
FRT 198, Load Rating of Bridge Size Culverts
Harik, I. (PI) & Peiris, N. (CoI)
5/1/13 → 5/1/13
Project: Research project