Grants and Contracts Details
Description
The objective of this research is to produce a practitioner’s guidebook in AASHTO format for post-award contract administration of
DB and CM/GC projects based on the identification and analysis of the methods utilized on the range of ACM projects.
• Roles and responsibilities of various parties within different type, size, and scope of DB and CMIGC projects.
• Advantages and disadvantages of different approaches for post-award contract administration of DB and CM/GC projects.
• The most effective methods for post-award contract administration for DB and CM/GC projects.
• Effective methods to implement project design and construction quality assurance (as defined in TRB E-Circular 173.
Status | Finished |
---|---|
Effective start/end date | 9/16/16 → 3/31/19 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.