Grants and Contracts Details
Description
problem in many sectors of industry. Scheduling strategies for various shop configurations and
performance criteria have been widely researched in academia. However, many companies-
mostly small and medium-sized ones, estimated to be around 330,000 in the U.S. (NAP, 1999)-
continue to experience difficulty in effectively scheduling jobs, for two reasons: having to face new
and more challenging manufacturing environments to which existing scheduling strategies are not
readily applicable and being unable to transfer academic findings into practical applications.
Mass customization, which requires efficient production of iMividually customized products
(or services), is an emerging strategy that can be a source of competitive advantage for many
companies. However the economic benefits of the strategy are out of reach unless companies can
manufacture and sell products at competitive prices with short lead times-which in turn requires
effective production scheduling. Kuhlman Electric, a company engaged in the mass customization
of transformers, is experiencing difficulty with effective production scheduling due to both the
obstacles mentioned above: lack of research-based strategies to handle new complex manufacturing
environments such as mass customization and lack of effective transfer of such academic findings
(once developed) into solutions usable by industry. The overall objective of this research is to
address both obstacles above through a university-industry collaborative project.
We define the scheduling problem at Kuhlman Electric's plant in Versailles, KY as an
associative parallel machine scheduling (APMS) problem. The APMS problem is more complex
than parallel machine scheduling (PMS), which in itself has been shown to be NP-hard, research on
such problems is not known. APMS problems can arise in situations when there is a high
variability in products and when there are multiple machines available of the same type but with
slightly different capabilities. Given the increasing demand for customized products, such APMS
situations are likely to arise more frequently in industry.
Researchers from the University of Kentucky and engineers from Kuhiman Electric working
will work in partnership to develop methods to solve the APMS problem. We will (I) formulate
the APMS situation as a mathematical programming problem and determine solution methods and
(2) study the challenges to effective transferability of academic research and propose strategies to
increase knowledge transfer to industry.
Broader Imnacts: The findings of this project, in addition to helping Kuhlman Electric, will
be of benefit to many other companies engaged in similar operations. Understanding
challenges to knowledge transferability has benefits in a much broader context and puts the
researchers in an even better position to assist companies that lack the resources available to
their larger counterparts who are able to research, develop and implement their own
scheduling methods. Mass customization, which is becoming increasingly popular and if
successfully implemented can become a tactical and strategic advantage for U.S.
companies over foreign manufacturers, is among the P1's major research interests. The
collaboration with Kuhlman Electric will establish an excellent partnership to continue research
in the area. The collaboration will also provide opportunities for hands-on manufacturing
experience for students and enable them to better understand the real-life scheduling problems
and how to incorporate relevant issues in developing solutions.
Intellectual Merit: This work will contribute to developing new methods to solve APMS
problems that arise in complex manufacturing environments such as in make-to-order! mass
customization. The novel aspect of this university-industry syiiergistic project is the focus on
learning and then mastering the challenges to transferability of knowledge to industry which
is as important as the scheduling methods developed. We also believe the research has the
Status | Finished |
---|---|
Effective start/end date | 7/1/06 → 6/30/10 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.