Description
OBJECTIVES: The objectives of this study are: 1) to review the state of the art on the
Superpave penneability issue, 2) to investigate the relationship between permeability and
pavement performance, 3) to investigate different strategies to address the high permeability issue
on pavements using Superpave mixtures, 4) to recommend appropriate solutions to the
permeability issue based on the analysis of different strategies, 5) to recommend adjustments on
current specifications to address the permeability issue.
BACKGROUND: Currently, the biggest issue concerning asphalt pavements in Kentucky is
permeability, which has also become an important issue in other states since the introduction of
coarse graded Superpave mixtures. This is due to the fact that a high permeability can result in
ingress of excessive amounts of water, which potentially can cause serious problems such as frost
heave, stripping, asphalt emulsification, pumping, etc.
Previous research has been conducted to develop a field permeability test for asphalt concrete and
aggregate bases. According to the research results, some pavements in Kentucky experience an
excessive level of permeability, especially at the construction joints. However, a solid strategy
for addressing this issue is not available yet. The objective of this research is to fmd solutions to
this problem. If permeability can be effectively reduced without affecting a pavement's other
desired properties, or damage caused by high permeability can be controlled, a longer pavement
service life can be expected.
FY 2006 ACCOMPLISHMENTS: Various field tests were run on several asphalt pavements,
designed with the permeability model, and the results were summarized. Permeability data
collected from previous research was reanalyzed. The reporting process began, as new
information was compared to existing data.
FY 2007 PROPOSED WORK: Permeability from several additional sites will be collected and
analysis will continue on recalibrating the permeability model. Comparisons of different options
will be summarized, recommendations will be made, and a report will be finalized.
PROJECTED COST THROUGH FY 2006:
PROGRAMMED COST FY 2007:
TOTAL ESTIMATED COST:
$140,000
$ 65,000
$200,000
Status | Finished |
---|---|
Effective start/end date | 7/1/06 → 6/30/07 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 07-27
Toussaint, P. (PI), Allen, D. (CoI), Chen, M. (CoI), Crabtree, J. (CoI), Graves, R. (CoI), Grossardt, T. (CoI), Hancher, D. (CoI), Harik, I. (CoI), Hopkins, T. (CoI), Hopwood, T. (CoI), Kreis, S. (CoI) & Pigman, J. (CoI)
7/1/06 → 6/30/07
Project: Research project