Projects and Grants per year
Grants and Contracts Details
Description
I) Ensure that the necessary equipment (abrasive recycling unit) and chemical lead
stabilizer are available for an experimental bridge mainten811ce painting project. 2) Develop necessary
letting documents (special notes) for use of equipment chemical stabilizer on a KYTC experimental
project. 3) Monitor the perfor111ance of the equipment/chemical stabilizer during the experimental project.
Evaluate the project 811d detennine the perfonnance of the unit/chemical stabilizer in proyidulg a nonhazardous
waste that is disposed in a Kenrud:y landfill. 4) Provide KYTC with recommendations for
any future reyisions/actions nec.essar:- for routine implementation of this process.
Status | Finished |
---|---|
Effective start/end date | 7/1/09 → 6/30/10 |
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 10-30
Hartman, D. (PI), Agent, K. (CoI), Crabtree, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hopwood, T. (CoI), Hunsucker, D. (CoI), Kirk, A. (CoI), Pigman, J. (CoI), Stamatiadis, N. (CoI) & Walton, J. (CoI)
7/1/09 → 6/30/10
Project: Research project