Projects and Grants per year
Grants and Contracts Details
Description
OBJECTIVES:
Continuation of an Approved Study
Anticipated Completion FY 2011
I. Ensure that the necessary equipment (abrasive recycling unit) and chemical lead
stabilizer are available for an experimental bridge maintenance painting project.
2. Develop necessary letting documents (special notes) for use of equipment! chemical
stabilizer 011 a KYTC experimental project.
3. Monitor the perf0l111anCe of the equipment!chemical stabilizer during the experimental
project.
4. Evaluate the project and detel111ine the perf01111ance of the unit/chemical stabilizer in
providing a non-hazardous waste that is disposed in a Kentucky landfill.
5. Provide KYTC with recommendations for any future revisions/actions necessary for
routine implementation of this process..
Status | Finished |
---|---|
Effective start/end date | 7/1/10 → 6/30/11 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 11-31
Crabtree, J., Agent, K., Ashurst, K., Fisher, J., Graves, R., Green, E., Grossardt, T., Harik, I., Hartman, D., Hopwood, T., Hunsucker, D., Kirk, A., Palle, S., Pigman, J., Rister, B., Stamatiadis, N., Taylor, T. & Walton, J.
7/1/10 → 6/30/11
Project: Research project