Projects and Grants per year
Grants and Contracts Details
Description
This project will continue to explore the options to identify the cause ofmaterial loss (voids) beneath the pavement. In addition, the Center will continue to research new techniques that may be ofbenefit to stabilize the existing subsurface.
Status | Finished |
---|---|
Effective start/end date | 1/1/07 → 6/30/14 |
Funding
- KY Transportation Cabinet: $234,389.00
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 2 Finished
-
Cumberland Gap Tunnel Inspection--Kentucky Highway Investigative Task No. 58
Dinger, J. (PI)
1/1/07 → 4/30/12
Project: Research project
-
Cumberland Gap Tunnel Inspection--Kentucky Highway Investigative Task No. 58
Rister, B. (PI), Graves, R. (CoI) & Harik, I. (CoI)
1/1/07 → 12/31/09
Project: Research project