Projects and Grants per year
Projects
- 2 Finished
Search results
-
Finished
Cumberland Gap Tunnel Inspection--Kentucky Highway Investigative Task No. 58
Dinger, J. (PI)
1/1/07 → 4/30/12
Project: Research project
-
Cumberland Gap Tunnel Inspection--Kentucky Highway Investigative Task No. 58
Rister, B. (PI), Graves, R. (CoI) & Harik, I. (CoI)
1/1/07 → 12/31/09
Project: Research project