The objective of this project is to implement the rec.ommendations in the University of
Kentud:y's 2004 study on this topic, thus preparing Kentucl.-:- for a possible large·scale. operational
deployment. This study will provide additional analysis of the simulation data 10 further assess (and
optimize) the perfOl11lanCe of the incident detection algorithm. In addition. a limited number ofDSRC
readers will be installed on a segment of Interstate highway in Kentucl.-:-·. Data will be collected from
these readers and will be processed 10 validate the simulation results. Recommendations will be
developed regarding a large·scale operational deployment. In addition. this studY will include an
assessment of the current state of research into using mobile phones for traffic monitoring and incident
detection.
Status | Finished |
---|---|
Effective start/end date | 7/1/09 → 6/30/10 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 10-30
Hartman, D. (PI), Agent, K. (CoI), Crabtree, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hopwood, T. (CoI), Hunsucker, D. (CoI), Kirk, A. (CoI), Pigman, J. (CoI), Stamatiadis, N. (CoI) & Walton, J. (CoI)
7/1/09 → 6/30/10
Project: Research project