Projects and Grants per year
Grants and Contracts Details
Description
OBJECTIVES: 1) Review current technologies available for machine grade control using GPS. 2)
Review other agencies guidelines for GPS survey specifications and coordination between highway
designers and construction personnel. 3) Conduct field trials using GPS machine control to evaluate
coordination activities necessary. 4) Evaluate the feasibility of utilizing the Kentucky Continuously
Operation Reference System (CORS) as based stations for GPS machine control.
Status | Finished |
---|---|
Effective start/end date | 7/1/10 → 6/30/11 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 11-31
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Fisher, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hartman, D. (CoI), Hopwood, T. (CoI), Hunsucker, D. (CoI), Kirk, A. (CoI), Palle, S. (CoI), Pigman, J. (CoI), Rister, B. (CoI), Stamatiadis, N. (CoI), Taylor, T. (CoI) & Walton, J. (CoI)
7/1/10 → 6/30/11
Project: Research project