Projects and Grants per year
Grants and Contracts Details
Description
OBJECTIVES: I) Review current technologies ava ilable for machine grade control using GPS. 2)
Review other agencies guidclines for GPS survey specifications and coordination between highway
designers and construction personnel. 3) Conduct field trials using GPS machine control to evaluate
coordination acti vities necessary. 4) Evaluate the fea sibility of utilizing the Kentucky Continuously
Operation Reference System (CaRS) as based stations for GPS machine contro l.
Status | Finished |
---|---|
Effective start/end date | 7/1/11 → 6/30/12 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 12-32
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Chen, M. (CoI), Fisher, J. (CoI), Goodrum, P. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hartman, D. (CoI), Hopwood, T. (CoI), Johnson, P. (CoI), Kirk, A. (CoI), Kreis, S. (CoI), McCormack, S. (CoI), Palle, S. (CoI), Pigman, J. (CoI), Rister, B. (CoI), Scully, T. (CoI), Stamatiadis, N. (CoI), Sun, L. (CoI), Taylor, T. (CoI) & Walton, J. (CoI)
7/1/11 → 6/30/12
Project: Research project