Projects and Grants per year
Grants and Contracts Details
Description
OBJECTIVES: The objective of this research is to develop an asset management system to
inventory the assets on Kentucky's state-maintained roadways. Secondary objectives are:
I) Design a system to work separately or conjunction with the Cabinet's video log system,
2) Create data in a fOlmat to be stored spatially and linked to the transpOltationnetwork,
3) Develop an end product similar to the SignClick software already in use, and
4) Develop a system for application in the field using GPS to locate the asset or in an office
to update or maintain the inventory.
Status | Finished |
---|---|
Effective start/end date | 7/1/10 → 6/30/11 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 11-31
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Fisher, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hartman, D. (CoI), Hopwood, T. (CoI), Hunsucker, D. (CoI), Kirk, A. (CoI), Palle, S. (CoI), Pigman, J. (CoI), Rister, B. (CoI), Stamatiadis, N. (CoI), Taylor, T. (CoI) & Walton, J. (CoI)
7/1/10 → 6/30/11
Project: Research project