Projects and Grants per year
Grants and Contracts Details
Description
OBJECTIVES: The objective of this research is to develop an asset management system to
inventory the assets on Kentucky's state-maintained roadways. Secondary objectives are:
I) Design a system to work separately or conjunction with the Cabinet's video log system,
2) Create data in a fOlmat to be stored spatially and linked to the transpOltationnetwork,
3) Develop an end product similar to the SignClick software already in use, and
4) Develop a system for application in the field using GPS to locate the asset or in an office
to update or maintain the inventory.
Status | Finished |
---|---|
Effective start/end date | 7/1/10 → 6/30/11 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 11-31
Crabtree, J., Agent, K., Ashurst, K., Fisher, J., Graves, R., Green, E., Grossardt, T., Harik, I., Hartman, D., Hopwood, T., Hunsucker, D., Kirk, A., Palle, S., Pigman, J., Rister, B., Stamatiadis, N., Taylor, T. & Walton, J.
7/1/10 → 6/30/11
Project: Research project