Grants and Contracts per year
Grants and Contracts Details
Description
The objective of this research is to develop an asset management system to inventory
the assets on Kentucky'S state-maintained roadways. Secondary objectives would be to accomplish the
following: I )Design a system that would work separately or conjunction with the Cabinet's potential
video log system, 2) Create data in a format that would allow it to be stored spatially in order to be linked
to the transportation network, 3) Develop an end product would be similar to the SignClick software
already in use, and 4) Develop a system that can be used in the field using GPS to locate the asset or in an
office to update or maintain the inventory.
Status | Finished |
---|---|
Effective start/end date | 7/1/09 → 6/30/10 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 10-30
Hartman, D., Agent, K., Crabtree, J., Graves, R., Green, E., Grossardt, T., Harik, I., Hopwood, T., Hunsucker, D., Kirk, A., Pigman, J., Stamatiadis, N. & Walton, J.
7/1/09 → 6/30/10
Project: Research project