Grants and Contracts per year
Grants and Contracts Details
Description
OBJECTIVES: The obj ective of this research is to update the Highway Design Manual to
reflect advances and changes in the practice since the last update of the manual. FY 11
deliverables include a draft of the revised highway design manual.
Status | Finished |
---|---|
Effective start/end date | 7/1/11 → 6/30/12 |
Funding
- KY Transportation Cabinet
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 12-32
Crabtree, J., Agent, K., Ashurst, K., Chen, M., Fisher, J., Goodrum, P., Graves, R., Green, E., Grossardt, T., Harik, I., Hartman, D., Hopwood, T., Johnson, P., Kirk, A., Kreis, S., McCormack, S., Palle, S., Pigman, J., Rister, B., Scully, T., Stamatiadis, N., Sun, L., Taylor, T. & Walton, J.
7/1/11 → 6/30/12
Project: Research project