Projects and Grants per year
Grants and Contracts Details
Description
The objectives of this study are: II Conduct a perfonnanee review of existing pipe
installations in conjunc.tion with KySPR-07-341 Pipe Perfonnance in Kentucky, to evaluate the condition
of existing pipe lining and coatings, 2) Test water runoff to detennine areas where protection may be
required, 3) Review the ayailable literature to detennine the CUITent state of practice for pipe coatings and
linings, 41 Develop appropriate recommendations for inclusion in Kentucl:y's current drainage manuaL
Status | Finished |
---|---|
Effective start/end date | 7/1/09 → 6/30/10 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 10-30
Hartman, D. (PI), Agent, K. (CoI), Crabtree, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hopwood, T. (CoI), Hunsucker, D. (CoI), Kirk, A. (CoI), Pigman, J. (CoI), Stamatiadis, N. (CoI) & Walton, J. (CoI)
7/1/09 → 6/30/10
Project: Research project