Projects and Grants per year
Grants and Contracts Details
Description
The objective of this study is to instrument on an mUlti-span bridge. the boltom
horizontal surface at the base of the footing of the pier with five soil pressure cells and temperature gages,
and instrument the vertical face of the footing and pier with three temperature gages each, and to
continuously monitor the 50il pressure and temperatures and compare the soil pressures with ones derived
using the AASHTO code.
Status | Finished |
---|---|
Effective start/end date | 7/1/09 → 6/30/10 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 10-30
Hartman, D. (PI), Agent, K. (CoI), Crabtree, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hopwood, T. (CoI), Hunsucker, D. (CoI), Kirk, A. (CoI), Pigman, J. (CoI), Stamatiadis, N. (CoI) & Walton, J. (CoI)
7/1/09 → 6/30/10
Project: Research project