Grants and Contracts Details
Description
SDDOT previously completed research project SD91-05 Essential Testing and Inspections Levels which
was conducted over 30 years ago. It would be beneficial to review SDDOT’s current construction
material testing and inspection program using a “Risk-Based Analysis”. This type of analysis would focus
on the value of each material test and type of inspection, thus helping SDDOT to direct resources to
where they would provide the most value and reduce the risk to end quality and performance. Risks
include but are not limited to time, cost, safety, quality, and scheduling. Advancements in technology and
software since SD91-05 have improved processes and productivity in the highway construction industry.
Current and emerging technologies should be considered in this research to improve the efficiency of
SDDOT construction material testing and inspection. The research will develop an efficient framework
that will improve the efficiency of materials testing at SDDOT
| Status | Active |
|---|---|
| Effective start/end date | 1/1/25 → 6/30/26 |
Funding
- Colorado State University: $20,000.00
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.