The overall project initial objective will be to obtain background information on the operation of two
different dry scrubber systems. On]site inspections of scrubber systems to two separate power plants
will be made. This will result in the formulation of a study plan for the evaluation of the physical and
chemical causes of fowling in the scrubber system leading to the development of a plan to reduce or
prevent future fowling.
Status | Finished |
---|---|
Effective start/end date | 11/1/14 → 6/30/15 |
Funding
- Electric Power Research Institute: $20,590.00