Grants and Contracts Details
Description
The obkectives of this study are:
Evaluate three sites for potential road diet conversions through simulations
Develop alternative designs
Evaluate design options.
Status | Finished |
---|---|
Effective start/end date | 5/1/10 → 10/31/10 |
Funding
- KY Transportation Cabinet: $30,000.00
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.