Grants and Contracts Details
Description
A follow-on study to an impromptu investigation of an anchor bolt failure on the downstream uplift bearing assembly at the north end of the cantilever truss (at pier 4) on the I-64 (JFK) bridge at Louisville.
Status | Finished |
---|---|
Effective start/end date | 4/1/07 → 7/30/13 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.