FRT 201, Estimation of ADT Traffic on Local Roads in KY, Phase 2

Grants and Contracts Details

Description

This study will continue to develop and improve the AADT estimation model. The improved model will be validated on a test group. The results of this validation will determine if the study should produce a statewide model. If warranted, a statewide model will be developed, providing KYTC with an AADT estimate on all roads without AADT
StatusFinished
Effective start/end date7/1/1312/31/15

Funding

  • KY Transportation Cabinet: $75,000.00

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.