FRT 208, SHRP2 IAP: PilotTesting of Reliability Data and Analysis Tools

Grants and Contracts Details

Description

The SHRP2 reliability tools (L02/L07/L08/C11/L05) are a bundle of products that enables agencies to include travel time reliability in project evaluation. The KTC team will assist KYTC implement these tools on four test sites as a proof of concept pilot. These sites include I-471 corridor, I-71/75/I-275 junction, Dixie Highway between Elizabethtown and Radcliff, and Scottsville Road corridor between I-65 and US31 in Bowling Green. The main tasks include data collection, model calibration, evaluation of existing condition, and evaluation of alternatives
StatusFinished
Effective start/end date4/1/156/30/21

Funding

  • KY Transportation Cabinet: $400,000.00

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.