Grants and Contracts Details
Description
The SHRP2 reliability tools (L02/L07/L08/C11/L05) are a bundle of products that enables agencies to include travel time reliability in project evaluation. The KTC team will assist KYTC implement these tools on four test sites as a proof of concept pilot. These sites include I-471 corridor, I-71/75/I-275 junction, Dixie Highway between Elizabethtown and Radcliff, and Scottsville Road corridor between I-65 and US31 in Bowling Green. The main tasks include data collection, model calibration, evaluation of existing condition, and evaluation of alternatives
Status | Finished |
---|---|
Effective start/end date | 4/1/15 → 6/30/21 |
Funding
- KY Transportation Cabinet: $400,000.00
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.