Grants and Contracts Details
Description
OBJECTIVES: The objectives for this project are to: 1) detennine the information needed to
characterize and locate the wetlands; 2) carry out an inventory of wetlands owned or under the
Cabinet's oversight; and 3) detennine the monitoring/preservation mandates and continuing
maintenance requirements for each wetland site.
BACKGROUND: KYTC has property containing wetlands that were either created or
purchased as compensation for other wetland takings (mitigation). After the Corps of Engineers
(COE) 5-year mandatory monitoring! preservation period, those wetlands require continued
maintenance to prevent problems such as flooding of adjacent properties and mosquito control.
Other issues requiring on-going KYTC wetlands management/maintenance include: weir control
to maintain proper water levels, beaver activities, fence maintenance, trespass prevention, and
vegetation control. Additionally, wetlands have been naturally established along some KYTC
rights-of-way as a consequence of the road building. Maintenance activities in those areas are
also problematic.
FY 2007 PROPOSED WORK: It is anticipated the wetlands infonnation needs will be
detennined and that significant progress will be made on inventorying sites owned by the
Cabinet.
PROGRAMMED COST FY 2007:
TOTAL ESTIMATED COST:
$ 60,000
$120,000
Status | Finished |
---|---|
Effective start/end date | 7/1/06 → 6/30/07 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 07-27
Toussaint, P. (PI), Allen, D. (CoI), Chen, M. (CoI), Crabtree, J. (CoI), Graves, R. (CoI), Grossardt, T. (CoI), Hancher, D. (CoI), Harik, I. (CoI), Hopkins, T. (CoI), Hopwood, T. (CoI), Kreis, S. (CoI) & Pigman, J. (CoI)
7/1/06 → 6/30/07
Project: Research project