Description
KYTC has property containing wetlands that were either created or
purchased as compensation for other wetland takings (mitigation). After the Corps of Engineers
(CaE) 5-year mandatory monitoring/ preservation period, those wetlands require continued
maintenance to prevent problems such as flooding of adjacent properties and mosquito control.
Other issues requiring on-going KYTC wetlands management/maintenance include: weir control
to maintain proper water levels, beaver activities, fence maintenance, trespass prevention, and
vegetation control. Additionally, wetlands have been naturally established along some KYTC
rights-of-way as a consequence of the road building. Maintenance activities in those areas are
also problematic.
Status | Finished |
---|---|
Effective start/end date | 7/1/07 → 6/30/08 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 08-28
Toussaint, P., Crabtree, J., Graves, R., Grossardt, T., Harik, I., Hopkins, T., Hopwood, T., Mahboub, K. & Pigman, J.
7/1/07 → 6/30/08
Project: Research project