Projects and Grants per year
Grants and Contracts Details
Description
OBJECTIVES: This project will evaluate the cUlTent state of practice for use of geotextiles and
geogrids in hi ghway applications. The objectives of the project are as follows:
I. Conduct an in-depth rev iew of current specifications used by other Departments of TranspOltation
nationwide.
2. Develop updated specifications for using geotextile and geogrids to ass ist design engineers,
specification writers, constructi on in spectors and mai ntenance personnel
3. Develop updated desi gn and construction guidelines for use of geotextile and geogrids on
highway projects.
4. Monitor the installation and performance of various geosynthetics and geogrids during and after
construction to verify any changes in usage specifications.
Status | Finished |
---|---|
Effective start/end date | 7/1/11 → 6/30/12 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 12-32
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Chen, M. (CoI), Fisher, J. (CoI), Goodrum, P. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hartman, D. (CoI), Hopwood, T. (CoI), Johnson, P. (CoI), Kirk, A. (CoI), Kreis, S. (CoI), McCormack, S. (CoI), Palle, S. (CoI), Pigman, J. (CoI), Rister, B. (CoI), Scully, T. (CoI), Stamatiadis, N. (CoI), Sun, L. (CoI), Taylor, T. (CoI) & Walton, J. (CoI)
7/1/11 → 6/30/12
Project: Research project