Grants and Contracts per year
Grants and Contracts Details
Description
Kentucky receives quite a large number of requests annually for utility
companies to bore under roadways to install utilities. These borings range in size from 2" up to
in excess of 24". On numerous occasions, the Cabinet is asked to approve non-standard
installations which mayor may not warrant installing a casing prior to installing the utility line.
Currently, the guidelines available to the permit engineers are somewhat limited in documenting
the particular methodologies which dictate when certain procedures are to be utilized. This
research effort will review the available literature from other agencies and utility companies to
determine the current state of practice for utility construction beneath roadways.
Status | Finished |
---|---|
Effective start/end date | 7/1/07 → 6/30/08 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 08-28
Toussaint, P., Crabtree, J., Graves, R., Grossardt, T., Harik, I., Hopkins, T., Hopwood, T., Mahboub, K. & Pigman, J.
7/1/07 → 6/30/08
Project: Research project