Grants and Contracts Details
Description
The project will demonstrate the normal flow depth in the hydraulic flume located in the Biosystems and Engineering Department as well as the flow depth following the installation of a structure with the goal of projecting the extent of backwater effects. A video will be produced to explain the experiment and results to the general public.
Status | Finished |
---|---|
Effective start/end date | 2/1/16 → 2/29/16 |
Funding
- Hopkinsville Surface and Stormwater Utility: $4,055.00
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.