Investigation of Anchor Rods on I-264 over Westport Road, KHIT 73

Grants and Contracts Details

Description

KYTC has installed a new exit from Watterson expressway (I264) over Westport Road in Louisville, KY. KYTC Division of Construction personnel requested KTC in assistaing to determine the length of anchor rods installed on the bearing pads. There are six anchor rods per bearing pad on each column and there are eight columns.
StatusFinished
Effective start/end date11/29/116/30/12

Funding

  • KY Transportation Cabinet: $10,212.00

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.