Grants and Contracts per year
Grants and Contracts Details
Description
OBJECTIVES: The objective of this research is to develop an asset management system to
inventory the assets on Kentucky's state-maintained roadways. Secondary objectives would be to
accomplish the following:
• Design a system that would work separately or conjunction with the Cabinet's potential video
log system,
• Create data in a format that would allow it to be stored spatially in order to be linked to the
transportation network,
• Develop an end product would be similar to the SignClick software already in use, and
• Develop a system that can be used in the field using GPS to locate the asset or in an office to
update or maintain the inventory.
Status | Finished |
---|---|
Effective start/end date | 7/1/08 → 6/30/09 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 09-29
Toussaint, P., Agent, K., Crabtree, J., Goodrum, P., Graves, R., Green, E., Grossardt, T., Harik, I., Hartman, D., Hopwood, T., Kirk, A., Pigman, J. & Stamatiadis, N.
7/1/08 → 6/30/09
Project: Research project