Projects and Grants per year
Projects
- 50 Finished
Search results
-
Finished
Long-Term Monitoring of Experimental Features
Toussaint, P. (PI)
7/1/06 → 6/30/07
Project: Research project
-
-
-
Reduction of Stresses on Buried Rigid Highway Structures Using the Imperfect Ditch Method and Expanded Polystyrene (Geofoam)
Hopkins, T. (PI)
7/1/06 → 6/30/07
Project: Research project
-
Guidelines for Installation of Buried Utilities in Right-Of-Way
Allen, D. (PI)
7/1/06 → 6/30/07
Project: Research project
-
-
Analysis of Permeability of Kentucky Hot Mix Pavements
Allen, D. (PI)
7/1/06 → 6/30/07
Project: Research project
-
Investigate Low-Cost Safety Measures at Signalized Intersections
Pigman, J. (PI)
7/1/06 → 6/30/07
Project: Research project
-
Forensic Evaluation of Premature PCC Pavement Distress
Graves, R. (PI)
7/1/06 → 6/30/07
Project: Research project
-
Evaluation of the Effectiveness of Pavement Rumble Strips
Pigman, J. (PI)
7/1/06 → 6/30/07
Project: Research project
-
-
-
Identification and Determination of Distress Levels and Rehabilitation Cycles
Allen, D. (PI)
7/1/06 → 6/30/07
Project: Research project
-
New Products and Experimental Methods Database
Allen, D. (PI)
7/1/06 → 6/30/07
Project: Research project
-
QC/QA - Evaluation of Effectiveness
Mahboub, K. (PI) & Hancher, D. (Former PI)
7/1/06 → 6/30/07
Project: Research project
-
-
Improve Safety of Workers During Highway Construction and Maintenance
Hancher, D. (PI)
7/1/06 → 6/30/07
Project: Research project
-
-
Technical Support for Implementation of Access Management Plan
Pigman, J. (PI)
7/1/06 → 6/30/07
Project: Research project
-
Investigation of the Extended Use of GPR (Ground Penetration Radar) for Measuring in-situ Material Quality Characteristics
Allen, D. (PI)
7/1/06 → 6/30/07
Project: Research project
-
-
Evaluation of the Effects of Diamond Grinding on PCC Pavement Performance
Allen, D. (PI)
7/1/06 → 6/30/07
Project: Research project
-
-
-
Evaluation and Implementation Issues for the 2002 Pavement Design Guide
Allen, D. (PI)
7/1/06 → 6/30/07
Project: Research project
-
Evaluation and Calibration of a New Bearing Capacity Model
Hopkins, T. (PI)
7/1/06 → 6/30/07
Project: Research project
-
-
Recycling Practices for Environmental Materials
Hopwood, T. (PI)
7/1/06 → 6/30/07
Project: Research project
-
Use of Ultra-Lightweight Geofoam to Reduce Stresses in Highway Culvert Extensions
Hopkins, T. (PI) & Toussaint, P. (Former PI)
7/1/06 → 6/30/07
Project: Research project
-
Durability Issues of Asphalt Pavements (Polymer Modifiers)
Allen, D. (PI)
7/1/06 → 6/30/07
Project: Research project
-
Remote Monitoring of Bridge Piers for Barge Impact
Harik, I. (PI)
7/1/06 → 6/30/07
Project: Research project
-
-
-
Seismic Evaluation of the Parkways in Western Ky
Harik, I. (PI)
7/1/06 → 6/30/07
Project: Research project
-
-
-
Analysis and Comparison of Automated Distress Equipment
Allen, D. (PI)
7/1/06 → 6/30/07
Project: Research project
-
-
Archaeological Impact Through GIS Analysis
Grossardt, T. (PI)
7/1/06 → 6/30/07
Project: Research project
-
-
-
-
-
Rideability Issues for Asphalt and Concrete Specification Modifications
Allen, D. (PI)
7/1/06 → 6/30/07
Project: Research project
-
Prevention of Volatile Organic Compound Releases From KyTC Bridge Painting Operations
Hopwood, T. (PI)
7/1/06 → 6/30/07
Project: Research project
-
-
Future Management Strategies for State Maintained Wetlands
Hopwood, T. (PI)
7/1/06 → 6/30/07
Project: Research project
-
-
Criteria for Justification and Design of Auxiliary Lanes
Pigman, J. (PI)
7/1/06 → 6/30/07
Project: Research project
-
Measuring the Value of Kentucky Vehicle Enforcement Activities
Pigman, J. (PI)
7/1/06 → 6/30/07
Project: Research project