Projects and Grants per year
Projects
- 52 Finished
- 1 - 50 out of 52 results
Search results
-
Finished
Update and Refine the Kentucky Strategic Highway Safety Plan: Kentucky's Roadmap to Safer Highways SPR No. 10-410
Pigman, J. (PI)
2/1/10 → 6/30/10
Project: Research project
-
Sealants, Treatments and Deicing Salt Practices to Limit Bridge Deck Corrosion 10-388
Hopwood, T. (PI)
7/1/09 → 6/30/10
Project: Research project
-
-
Evaluation of KyTC Staffing Needs and Contract Services 09-381
Kirk, A. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Idenification of Secondary Crashes and Recommended Countermeasures 10-402
Kirk, A. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Developing and Implementing Strategies to Address "Freddie and Free-Roader" 10-391
Hunsucker, D. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Identify Causes and Countermeasures Related to Motorcycle Crashes 10-400
Agent, K. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Construction Change Orders and Lessons Learned SPR No. 09-384
Goodrum, P. (PI) & Taylor, T. (CoI)
7/1/09 → 6/30/10
Project: Research project
-
Implementation of Remote Sensing Technology 03-260
Harik, I. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Demonstrate and Evaluate the Use of DSRC Technology & Assess the Potential Use of Cell Phone Technology for Travel Time Monitoring and Incident Detection on Kentucky's Interstate Highways 09-383
Crabtree, J. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Effect of Thermal Loads on Bridge Substructures 10-408
Harik, I. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Long-Term Monitoring of Experimental Features 85-107
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Predictive Model for Threatened and Endangered Species 10-403
Grossardt, T. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Evaluation of Maintaining Adequate Air Void System for PCC 08-363
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project
-
-
Development of Pipe Coating, Paving, & Lining Specifications 08-356
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Analysis of Geologic Context of Transportation Maintenance Costs 10-392
Graves, R. (PI)
7/1/09 → 7/1/09
Project: Research project
-
Local Calibration and Trategic PLan for Implementation of AASHTO Mechanistic Empirical Pavement Design Guide (MEPDG) 10-396
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Kentucky Bridges Incorporating High-Strength Quenched and Tempered (Q & T) Steel 10-401
Hopwood, T. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Evaluation of Intelligent Compaction in Kentucky 09-372
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Evaluation of Deterioration of Structural Concrete Due to Chloride Entrainment and Other Damaging Mechanisms 10-406
Hopwood, T. (PI)
7/1/09 → 6/30/10
Project: Research project
-
-
Cost Effectiveness of Pavement Treatments 07-343
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Scour Countermeasures for three-Sided Culverts 08-357
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Use of Ground Penetrating Radar (GPR) for Rapid Inspection of Bridge Decks to Detect Area of Deterioration for Future Rehabilitation 09-370
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Fluorescing Coatings for Improved Inspection During Bridge Maintenance Painting 09-377
Hopwood, T. (PI)
7/1/09 → 6/30/10
Project: Research project
-
-
Develop Consistent Guidelines for Disposition of Excess ROW 10-390
Grossardt, T. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Evaluation of Pilot Project: Emergency Traffic Control for Responders 10-398
Walton, J. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Roadway Related Tort Liability and Risk Management 10-399
Agent, K. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Evaluation of Non-Nuclear Methods for Compaction Quality Control 09-371
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project
-
GIS Archeological Predictive Modeling Phase III 10-389
Grossardt, T. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Develop an Asset Management System to Compliment the Video System 09-386
Green, E. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Remote Monitoring of Bridge Piers for Barge Impact 06-322
Harik, I. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Idenification of Factors that Influence Pavement Performance 09-374
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Evaluation of Technolgies for Detection at Traffic Signals 08-365
Pigman, J. (PI)
7/1/09 → 6/30/10
Project: Research project
-
-
To Evaluate the Effectiveness of Internal Drainage Layers Used in Pavement Structures 09-373
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Evaluation and Monitoring of Kentucky's New Pipe Policy 10-394
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project
-
-
-
Evaluation of the Use of Painted and Unpainted Weathering Steel on Bridges 10-407
Hopwood, T. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Automated Chemical Stabilizing of Leaded Paint Residue from Bridge Maintenance Painting 09-378
Hopwood, T. (PI)
7/1/09 → 6/30/10
Project: Research project
-
-
Development of a Guardrail Location and Prioritization Program 08-358
Pigman, J. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Improving Intersection Design Practices 09-380
Stamatiadis, N. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Improved Longitudinal Joint Construction 10-393
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project
-
Update Crash Analysis Tools: Buildup and Critical Rate Calculator 10-397
Green, E. (PI)
7/1/09 → 6/30/10
Project: Research project
-
-
Forensic Evaluation of Premature PCC Pavement Distress 06-327
Graves, R. (PI)
7/1/09 → 6/30/10
Project: Research project