Grants and Contracts Details
Description
The Kentucky Transportation Cabinet (KYTC) has requested that the Kentucky Transportation Center (KTC) provide a GPR analysis of the pavement and subgrade along US 31W between MP 6.6 and MP 11.7 for the pavement rehabilitation project. The work will determine the existing pavement thicknesses and condition of the subgrade using Ground Penetrating Radar (GPR).
Status | Finished |
---|---|
Effective start/end date | 7/8/14 → 6/30/15 |
Funding
- KY Transportation Cabinet: $45,000.00
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.