Grants and Contracts Details
Description
The Kentucky Transportation Cabinet’s (KYTC) Construction Guidance Manual was last updated in 2009 from a 1995 version. This revision brought many processes up-to-date but did not capture newer construction requirements. The current size of the Construction Guidance Manual is also seen as an issue in usability. There is a need to revise and update the KYTC’s Construction Guidance Manual, and to the extent possible, create a comprehensive, organized, and usable, volume-based resource for construction management staff. The objective of this research is to update and combine KYTC’s construction management resources into a user-friendly knowledge management and transfer mechanism. This update will capture revisions to processes and procedures that occurred after the last Construction Guidance Manual revision and fold in other supplemental resources that have been developed to compensate for missing, incorrect, or difficult to use material currently in the guidance manual.
Status | Finished |
---|---|
Effective start/end date | 9/1/14 → 6/30/21 |
Funding
- KY Transportation Cabinet: $149,895.00
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.