Projects and Grants per year
Grants and Contracts Details
Description
OBJECTIVES: The objectives of this project are: I) Review cutTent activities relating to local
calibration procedures of the NCHRP MEPDG. 2) Select in-service pavement sections to correlate
predicted performance with actual performance to adjust the MEPDG prediction models. 3) Develop
appropriate calibration factors for each predicted distress. 4) Develop a detailed implementation plan
for integration of the new des ign guide into Kentucky's design process.
Status | Finished |
---|---|
Effective start/end date | 7/1/11 → 6/30/12 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 12-32
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Chen, M. (CoI), Fisher, J. (CoI), Goodrum, P. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hartman, D. (CoI), Hopwood, T. (CoI), Johnson, P. (CoI), Kirk, A. (CoI), Kreis, S. (CoI), McCormack, S. (CoI), Palle, S. (CoI), Pigman, J. (CoI), Rister, B. (CoI), Scully, T. (CoI), Stamatiadis, N. (CoI), Sun, L. (CoI), Taylor, T. (CoI) & Walton, J. (CoI)
7/1/11 → 6/30/12
Project: Research project