Projects and Grants per year
Grants and Contracts Details
Description
OBJECTIVE: To provide a procedure for long-term monitoring and reporting of experimental
design, construction, or maintenance features utilized in transportation facilities.
BACKGROUND: As technology advances, there is a continually increasing number of
somewhat unique or innovative approaches used as experimental features in transportation
design, construction, or maintenance phases. Provisions are generally made for short-term
evaluations of experimental features; however, most formal studies or projects are frequently
finalized in rather nominal time periods and no provisions are made for long-term evaluations.
Long-term evaluations provide significant information at relatively nominal costs.
FY 2007 PROPOSED WORK: Field inspections and data analyses will continue. Additional
projects containing experimental features will be scheduled for monitoring as they evolve.
Monitoring of projects presently included under this study will continue.
Status | Finished |
---|---|
Effective start/end date | 7/1/06 → 6/30/07 |
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 07-27
Toussaint, P. (PI), Allen, D. (CoI), Chen, M. (CoI), Crabtree, J. (CoI), Graves, R. (CoI), Grossardt, T. (CoI), Hancher, D. (CoI), Harik, I. (CoI), Hopkins, T. (CoI), Hopwood, T. (CoI), Kreis, S. (CoI) & Pigman, J. (CoI)
7/1/06 → 6/30/07
Project: Research project