Projects and Grants per year
Grants and Contracts Details
Description
OBJECTIVES:
NEW COATINGS FOR BRIDGES (OVER-COAT SYSTEMS)
KYSPR-11-425
Continuati on of an Approved Study
Anticipated Completion: FY 12
I. Identi fy new/improved coatings systems fo r use on overcoating operations.
2. Obtain samples of selected coatings systems and subj ect to materials characteri zati on at the
KYTC Division of Materi als.
3. Perform accelerated weathering/corrosions test at the KTC coatings laboratOlY.
4. Determine coatings systems that meet KYTC accelerated test requi rements.O
Status | Finished |
---|---|
Effective start/end date | 7/1/11 → 6/30/12 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 12-32
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Chen, M. (CoI), Fisher, J. (CoI), Goodrum, P. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hartman, D. (CoI), Hopwood, T. (CoI), Johnson, P. (CoI), Kirk, A. (CoI), Kreis, S. (CoI), McCormack, S. (CoI), Palle, S. (CoI), Pigman, J. (CoI), Rister, B. (CoI), Scully, T. (CoI), Stamatiadis, N. (CoI), Sun, L. (CoI), Taylor, T. (CoI) & Walton, J. (CoI)
7/1/11 → 6/30/12
Project: Research project