Grants and Contracts Details
Description
The KY Transportation Center will perform an assessment of both the existing pavement and the underlying sub-grade conditions on I-65 mileposts 104-131 in specific locations designated by the sponsor. This assessment should assist Cabinet officials determine an appropriate strategy to perform a preliminary highway design.
Status | Finished |
---|---|
Effective start/end date | 3/7/06 → 12/31/06 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.