Grants and Contracts Details
Description
A section of I-64 in Jefferson County will be rehabilitated by diamond grinding and patching with a proprietary material identified as Fibercrete, a flexible asphalt and concrete patching and crack-sealing material consisting of a polymer-modified asphalt binder along with recycled steel fibers, aggregates ad recycled tire rubber. The Kentucky Transportation Center will monitor the construction and long-term performance of this material at the site.
Status | Finished |
---|---|
Effective start/end date | 2/1/06 → 3/31/08 |
Funding
- KY Transportation Cabinet: $12,000.00
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.