Grants and Contracts per year
Grants and Contracts Details
Description
OBJECTIVES: 1) Develop guidelines and reporting format for pipe video and laser/mandrel inspection,
2) Determine the penalties for pipe defects found during inspection, 3) Determine the feasibility of
developing a mechani sm to quickly analyze fl exible pipes deflected over 7.5% based on AASHTO LRFD
Bridge Design SpecijicG/iolls Sec/ion 12 - Buried S/rllc/ures Gild TUllnel Liners
The deliverables of the project will be doc umented guidelines and specifications for in spection of
highway culverts. In addition, a documented process to evaluate cul velts with defl ections greater than
7.5% will be provided.
Status | Finished |
---|---|
Effective start/end date | 7/1/11 → 6/30/12 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 12-32
Crabtree, J., Agent, K., Ashurst, K., Chen, M., Fisher, J., Goodrum, P., Graves, R., Green, E., Grossardt, T., Harik, I., Hartman, D., Hopwood, T., Johnson, P., Kirk, A., Kreis, S., McCormack, S., Palle, S., Pigman, J., Rister, B., Scully, T., Stamatiadis, N., Sun, L., Taylor, T. & Walton, J.
7/1/11 → 6/30/12
Project: Research project