Grants and Contracts per year
Grants and Contracts Details
Description
Develop guidelines and reporting format for pipe video and laser/mandrel inspection
2. Detennine the penalties for pipe defects found during inspection
3. Determine the feasibility of developing a mechanism to quickly analyze flexible pipes deflected
over 7.5% based on AASHTO LRFD Bridge Design Specifications Section 12 - Buried Structures
and Tunnel Liners
Status | Finished |
---|---|
Effective start/end date | 7/1/10 → 6/30/11 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 11-31
Crabtree, J., Agent, K., Ashurst, K., Fisher, J., Graves, R., Green, E., Grossardt, T., Harik, I., Hartman, D., Hopwood, T., Hunsucker, D., Kirk, A., Palle, S., Pigman, J., Rister, B., Stamatiadis, N., Taylor, T. & Walton, J.
7/1/10 → 6/30/11
Project: Research project