Projects and Grants per year
Grants and Contracts Details
Description
Develop guidelines and reporting format for pipe video and laser/mandrel inspection
2. Detennine the penalties for pipe defects found during inspection
3. Determine the feasibility of developing a mechanism to quickly analyze flexible pipes deflected
over 7.5% based on AASHTO LRFD Bridge Design Specifications Section 12 - Buried Structures
and Tunnel Liners
Status | Finished |
---|---|
Effective start/end date | 7/1/10 → 6/30/11 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 11-31
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Fisher, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hartman, D. (CoI), Hopwood, T. (CoI), Hunsucker, D. (CoI), Kirk, A. (CoI), Palle, S. (CoI), Pigman, J. (CoI), Rister, B. (CoI), Stamatiadis, N. (CoI), Taylor, T. (CoI) & Walton, J. (CoI)
7/1/10 → 6/30/11
Project: Research project