Reduction of Stresses on Buried Rigid Highway Structures Using the Imperfect Ditch Method and Expanded Polystyrene (Geofoam) 01-228

  • Hopkins, Tommy (PI)

Grants and Contracts Details

Description

There is no abstact or scope of work available.
StatusFinished
Effective start/end date7/1/056/30/06