OBJECTIVES: The objective of this study is to examine the use of expanded polystyrene
(geofoam) and the imperfect ditch method for reducing the vertical stresses on rigid buried
highway structures, such as pipes and culverts.
BACKGROUND: Construction of highway embankments above highway pipes and culverts has
great practical significance because of the stresses imposed by the fill on the buried structure.
Relative stiffness of the culvert and soil control the magnitude and distribution of earth pressure
on the buried structure. The vertical earth pressure on a flexible culvert is less than the weight of
the soil about the culvert due to positive arching. However, the vertical earth pressure on a rigid
culvert, or pipe, is greater than the weight of the soil above the structure because of negative
arching. Experiments have shown that the loads on rigid embankment culverts were some 90 to
95 percent greater than the weight of the soil directly above the structure. In model tests
performed by Hoeg (1968), the crown pressure was about 1.5 times the applied surcharge.
Penman et al. (1975) measured the earth pressure on a rigid reinforced concrete earth pressure
below 174 feet of rock fill and found that the vertical earth pressure on the culvert crown was
about 2 times the overburden stress due to the fill above the top of the culvert. To avoid high
stresses on rigid buried structures, the imperfect trench, or induced, ditch method of construction
was invented. The imperfect trench method involves installing a compressible layer above the
culvert within the backfill. Traditionally, such compressible materials as baled straw, leaves, old
tires (used in France), or compressible soil, have been used. As the embankment is constructed,
the soft zone compresses more than the surrounding fill. This process induces positive arching
which reduces the stresses on the buried structure.
FY 2006 ACCOMPLISHMENTS: Construction of an embankment located above a reinforced
concrete box culvert on Ky Route 127 (Jamestown Bypass) was almost completed. The
contractor is scheduled to complete the pavement before July 2006. Installation of all
instrumentation of the culvert was completed. Twelve stress cells, 2 inverted settlement
platforms, and 3 strain gages were installed on and in culvert. This site was selected to
demonstrate the use of the "imperfect ditch" (backfilled with compressible geofoam) technique to
reduce stresses acting on a culvert.
Stress measurements on the top slab and sidewall of the culvert, strain in the top slab, and
settlement of the geofoam were obtained once a week as the fill was constructed. Analysis of
measured versus predicted stresses were performed. Personnel in the Division of Bridges have
been contacted about other culverts to analyze. An interim report was issued documenting the
numerical analysis (using FLAC 4.0) to predict stresses and to fmd the optimum location of the
trench and geofoam to reduce stresses. Field measurements show a great reduction in vertical
stresses acting on the culvert when the imperfect trench with geofoam is used.
FY 2007 PROPOSED WORK: Measurements of stresses and strains of the culvert at the
Jamestown Bypass site will continue periodically after construction of the embankment
Measurements will be made periodically after construction. The Research Study Advisory
Committee is working to locate another site to instrument. Numerical analysis has been
performed at two other sites and a potential site has been evaluated. This site will be
instrumented depending on the timing of the contract letting. Stress results obtained from field
measurements will be compared to those predicted using finite differences analyses (FLAC 4.0).
A fmal report will be issued.
Status | Finished |
---|---|
Effective start/end date | 7/1/06 → 6/30/07 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 07-27
Toussaint, P., Allen, D., Chen, M., Crabtree, J., Graves, R., Grossardt, T., Hancher, D., Harik, I., Hopkins, T., Hopwood, T., Kreis, S. & Pigman, J.
7/1/06 → 6/30/07