The objective of this study is 10 equip the L:S 41N bridge with technolog:. to monitor the
bridge piers for impact from a barge or flotilla. Once installed. the technolog:. will be evaluated for a
period of two years.
Status | Finished |
---|---|
Effective start/end date | 7/1/09 → 6/30/10 |