Projects and Grants per year
Grants and Contracts Details
Description
The objective of this study is 10 equip the L:S 41N bridge with technolog:. to monitor the
bridge piers for impact from a barge or flotilla. Once installed. the technolog:. will be evaluated for a
period of two years.
Status | Finished |
---|---|
Effective start/end date | 7/1/09 → 6/30/10 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 10-30
Hartman, D. (PI), Agent, K. (CoI), Crabtree, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hopwood, T. (CoI), Hunsucker, D. (CoI), Kirk, A. (CoI), Pigman, J. (CoI), Stamatiadis, N. (CoI) & Walton, J. (CoI)
7/1/09 → 6/30/10
Project: Research project