OBJECTIVES: The objectives ofthis study are: I) to summarize and review concerns on the
current rideability specifications, with special attention paid to the discrepancy between asphalt
and concrete rideability specifications, 2) to analyze the historical data on rideability for asphalt
and concrete projects, 3) to analyze the effects of initial rideability from aspects such as driving
quality, vehicle operating costs, and pavement service life, 4) to evaluate the necessity for the
current specification changes in order to address the concerns and to recommend specification
modifications based on research results
BACKGROUND: Kentucky currently pays incentives/disincentives on the initial rideability of
both asphalt and concrete projects. However, concerns have been raised on the discrepancies
between the incentive/disincentive schedules between the asphalt and concrete projects. In
addition, the test procedures for asphalt and concrete pavements are different.
For example, for asphalt pavements, the Department divides and tests each traffic lane
using one-mile test sections, and then transforms the measured roughness to the International
Roughness Index (IRl). For concrete pavements, the Department first tests pavement surface
with the profilograph on a section of 1,000 linear feet. Only pavements with PI no more than 6
inches will be full pay and may receive an incentive. The length ofthe test section to judge ride
quality incentive for concrete is the same as the asphalt, but the adjustment schedule is different.
This project will investigate how to make fair payment adjustments on initial ride quality
for both asphalt and concrete pavements and recommend specification modification if necessary.
FY 2006 ACCOMPLISHMENTS: Historical data such as initial ride quality, paid
incentive/disincentive, and the performance of pavements with different initial roughness was
collected and summarized. Meetings were held with the study advisory committee and
representatives of the industries for their input.
FY 2007 PROPOSED WORK: A rough draft of the report will be prepared and submitted for
review
PROJECTED COST THROUGH FY 2006:
PROGRAMMED COST FY 2007:
TOTAL ESTIMATED COST:
$100,000
$ 50,000
$200,000
| Status | Finished |
|---|---|
| Effective start/end date | 7/1/06 → 6/30/07 |
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
Kentucky Cooperative Transportation Research Program Part II KCTRP 07-27
Toussaint, P. (PI), Allen, D. (CoI), Chen, M. (CoI), Crabtree, J. (CoI), Graves, R. (CoI), Grossardt, T. (CoI), Hancher, D. (CoI), Harik, I. (CoI), Hopkins, T. (CoI), Hopwood, T. (CoI), Kreis, S. (CoI) & Pigman, J. (CoI)
7/1/06 → 6/30/07
Project: Research project