Projects and Grants per year
Grants and Contracts Details
Description
Treatments will be placed at the selected locations and speed data will be collected at each location. KTC personnel will visit these sites and collect required data to monitor and evaluate the effectiveness of each treatment. Analysis of collected data will be performed to determine the most effective treatments, and design guidelines will be proposed for review and approval.
Objectives are a follows: Evaluate existing designs utilized in rural areas to built-up transition zones Document and identify case studies in Kentucky Conduct site evaluation of specific treatments
Status | Finished |
---|---|
Effective start/end date | 7/1/13 → 6/30/14 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
SPR 2014 Prime KTC
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Chen, M. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hartman, D. (CoI), Hopwood, T. (CoI), Hunsucker, D. (CoI), Kirk, A. (CoI), Kreis, S. (CoI), McCormack, S. (CoI), O'Connell, L. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Pigman, J. (CoI), Ripy, J. (CoI), Rister, B. (CoI), Rose, J. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Stamatiadis, N. (CoI), Sun, L. (CoI), Taylor, T. (CoI), Wallace, C. (CoI) & Walton, J. (CoI)
7/1/13 → 6/30/14
Project: Research project