Projects and Grants per year
Grants and Contracts Details
Description
Repair of potholes in reinforced concrete (RC) bridge decks in winter is time consuming and rarely successful due to the severe ambient conditions. This study will identify newly developed materials that can harden and bond to the pothole walls and harden under cold weather conditions. The objective of this research is test a number of recently developed rapid-set products under ambient winter-time conditions, and to develop a process and a training course to assist KyTC in the rapid evaluation and repair of potholes in bridge decks in winter.
Status | Finished |
---|---|
Effective start/end date | 7/1/13 → 6/30/14 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
SPR 2014 Prime KTC
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Chen, M. (CoI), Graves, R. (CoI), Green, E. (CoI), Grossardt, T. (CoI), Harik, I. (CoI), Hartman, D. (CoI), Hopwood, T. (CoI), Hunsucker, D. (CoI), Kirk, A. (CoI), Kreis, S. (CoI), McCormack, S. (CoI), O'Connell, L. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Pigman, J. (CoI), Ripy, J. (CoI), Rister, B. (CoI), Rose, J. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Stamatiadis, N. (CoI), Sun, L. (CoI), Taylor, T. (CoI), Wallace, C. (CoI) & Walton, J. (CoI)
7/1/13 → 6/30/14
Project: Research project