SPR 12-436 Bridge Deck Rapid Repair

Grants and Contracts Details

Description

Repair of potholes in reinforced concrete (RC) bridge decks in winter is time consuming and rarely successful due to the severe ambient conditions. This study will identify newly developed materials that can harden and bond to the pothole walls and harden under cold weather conditions. The objective of this research is test a number of recently developed rapid-set products under ambient winter-time conditions, and to develop a process and a training course to assist KyTC in the rapid evaluation and repair of potholes in bridge decks in winter.
StatusFinished
Effective start/end date7/1/136/30/14

Funding

  • KY Transportation Cabinet

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.