Projects and Grants per year
Grants and Contracts Details
Description
Develop a method to assess the vulnerability of assets to extreme weather events, including
their vulnerability to the secondary and cumulative effects of these events on environmental
factors such as soil geology and slope stability.
• Perform a vulnerability assessment that identifies assets vulnerable to extreme weather
events.
• Incorporate the findings into KYTC's decision-making for planning, design, operations and
mall1tenancc processes.
• Develop a GIS-based data system compatible with existing Cabinet systems, and the extent
of the pilot will initially include the assessment of the NHS as defined by MAP-21.
Status | Finished |
---|---|
Effective start/end date | 7/1/14 → 6/30/18 |
Funding
- KY Transportation Cabinet
Fingerprint
Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.
Projects
- 1 Finished
-
SPR 2016 Prime
Crabtree, J. (PI), Agent, K. (CoI), Ashurst, K. (CoI), Blandford, B. (CoI), Chen, M. (CoI), Gibson, J. (CoI), Graves, R. (CoI), Green, E. (CoI), Harik, I. (CoI), Howell, B. (CoI), Kirk, A. (CoI), Kissick, J. (CoI), Kreis, S. (CoI), Martin, S. (CoI), Palle, S. (CoI), Peiris, N. (CoI), Rister, B. (CoI), Scully, T. (CoI), Souleyrette, R. (CoI), Spellman, M. (CoI), Stamatiadis, N. (CoI), Sturgill, R. (CoI), Sun, L. (CoI), Taylor, T. (CoI), VanDyke, C. (CoI), Wallace, C. (CoI), Walton, J. (CoI), Agarwal, N. (Former CoI), Fields, M. (Former CoI), Hopwood, T. (Former CoI), Hunsucker, D. (Former CoI), McCormack, S. (Former CoI), O'Connell, L. (Former CoI) & Pigman, J. (Former CoI)
7/1/14 → 6/30/19
Project: Research project